{"key":"ai-energy-meter","updated":"2026-11-16","count_label":"99 sourced rows, 64 map features","data_note":"National figures are official statistics or government-commissioned studies and use different scopes and years. Per-prompt figures are self-reported by companies with different methods and are not directly comparable. Campus sizes are as announced; announced capacity is not the same as electricity use.","glance":[{"label":"World data centres, 2025","value":"485 TWh","sub":"up 17% on 2024","source":"https:\/\/www.iea.org\/reports\/key-questions-on-energy-and-ai\/executive-summary"},{"label":"AI-focused data centres, 2025","value":"155 TWh","sub":"up 50% in a year","source":"https:\/\/www.iea.org\/reports\/key-questions-on-energy-and-ai\/executive-summary"},{"label":"Projected for 2030","value":"950 TWh","sub":"about 3% of world electricity","source":"https:\/\/www.iea.org\/reports\/key-questions-on-energy-and-ai\/executive-summary"},{"label":"US data centres, 2023","value":"4.4%","sub":"176 TWh, up to 12% by 2028","source":"https:\/\/www.energy.gov\/articles\/doe-releases-new-report-evaluating-increase-electricity-demand-data-centers"},{"label":"Ireland, 2025","value":"23%","sub":"of metered electricity","source":"https:\/\/www.cso.ie\/en\/releasesandpublications\/ep\/p-dcmec\/datacentresmeteredelectricityconsumption2025\/keyfindings\/"},{"label":"Virginia, 2023","value":"25.6%","sub":"of state electricity, highest in the US","source":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product"}],"charts":[{"id":"world","type":"cols","title":"Data centre electricity use, world (TWh)","label":"World data centres, TWh (2030 and 2035 are IEA projections)","data":[["2024",415],["2025",485],["2030",945],["2035 Base",1200]],"fmt":"num","keep_order":true,"source_label":"IEA, Energy and AI (2025, 2026)"},{"id":"scen2035","type":"cols","title":"IEA scenarios for 2035 (TWh)","label":"World data centres in 2035 by IEA scenario, TWh","data":[["Headwinds",700],["High Efficiency",970],["Base",1200],["Lift-Off",1700]],"fmt":"num","keep_order":true,"source_label":"IEA, Energy and AI (2025)"},{"id":"us","type":"cols","title":"US data centre electricity use (TWh)","label":"US data centres, TWh (2028 is the LBNL range)","data":[["2014",58],["2023",176],["2028 low",325],["2028 high",580]],"fmt":"num","keep_order":true,"source_label":"LBNL for US DOE (2024)"},{"id":"growth2030","type":"hbars","title":"Added data centre demand to 2030 (TWh)","label":"Increase in data centre electricity use by 2030, TWh","data":[["United States",240],["China",175],["Europe",45],["Japan",15]],"fmt":"num","source_label":"IEA, Energy and AI (2025)"},{"id":"cmp-all","type":"hbars","title":"Data centres vs whole countries (TWh, 2025)","label":"World data centres vs national electricity generation, 2025, TWh","data":[["All data centres",485],["Japan",1027],["France",574],["Germany",497],["Saudi Arabia",471],["Mexico",390],["United Kingdom",294],["Spain",288],["Australia",286],["Italy",265]],"fmt":"num","max":12,"source_label":"IEA (data centres), Ember (national generation)"},{"id":"cmp-ai","type":"hbars","title":"AI data centres vs countries (TWh, 2025)","label":"AI-focused data centres vs national generation, 2025, TWh","data":[["AI data centres",155],["Poland",173],["Sweden",170],["Norway",161],["Argentina",153],["Netherlands",135],["Google data centres",42.42]],"fmt":"num","max":12,"source_label":"IEA, Ember, Google 2026 Environmental Report"},{"id":"ireland","type":"cols","title":"Ireland: data centre share of electricity (%)","label":"Ireland, data centres as % of metered electricity","data":[["2015",5],["2023",21],["2024",22],["2025",23]],"fmt":"pct","keep_order":true,"source_label":"CSO Ireland"},{"id":"netherlands","type":"cols","title":"Netherlands: data centre share of electricity (%)","label":"Netherlands, data centres as % of electricity use","data":[["2017",1.48],["2018",2.09],["2019",2.42],["2020",2.82],["2021",3.29],["2022",3.98],["2023",4.19],["2024",4.58]],"fmt":"pct","keep_order":true,"source_label":"CBS Netherlands"},{"id":"states","type":"hbars","title":"US states: data centre share of electricity, 2023 (%)","label":"Top US states by data centre share of electricity, 2023","data":[["Virginia",25.59],["North Dakota",15.42],["Nebraska",11.7],["Iowa",11.43],["Oregon",11.39],["Wyoming",11.26],["Nevada",8.69],["Utah",7.68],["Arizona",7.43],["Washington",5.69]],"fmt":"pct","source_label":"EPRI (2024)"},{"id":"states-twh","type":"hbars","title":"US states: data centre electricity, 2023 (TWh)","label":"Top US states by data centre electricity use, 2023, TWh","data":[["Virginia",33.85],["Texas",21.81],["California",9.33],["Illinois",7.45],["Oregon",6.41],["Arizona",6.25],["Iowa",6.19],["Georgia",6.17],["Washington",5.17],["Pennsylvania",4.59]],"fmt":"num","source_label":"EPRI (2024)"},{"id":"co-google","type":"cols","title":"Google: Data centre electricity (TWh)","label":"Google, Data centre electricity (TWh)","data":[["2021",17.43],["2022",20.62],["2023",23.98],["2024",30.64],["2025",42.42]],"fmt":"num","keep_order":true,"source_label":"Google environmental report"},{"id":"co-microsoft","type":"cols","title":"Microsoft: Total electricity (TWh, fiscal years)","label":"Microsoft, Total electricity (TWh, fiscal years)","data":[["FY20",10.77],["FY21",13.62],["FY22",18.15],["FY23",23.57],["FY24",29.83],["FY25",37.03]],"fmt":"num","keep_order":true,"source_label":"Microsoft environmental report"},{"id":"co-meta","type":"cols","title":"Meta: Total electricity (TWh)","label":"Meta, Total electricity (TWh)","data":[["2020",7.17],["2021",9.42],["2022",11.51],["2023",15.33],["2024",18.42]],"fmt":"num","keep_order":true,"source_label":"Meta environmental report"},{"id":"ms-water","type":"cols","title":"Microsoft water consumption (megalitres)","label":"Microsoft total water consumption, megalitres","data":[["FY20",3990],["FY21",4794],["FY22",5329],["FY23",5818],["FY24",6693],["FY25",8170]],"fmt":"num","keep_order":true,"source_label":"Microsoft 2026 Environmental Data Fact Sheet"}],"sections":[{"id":"map","type":"map","title":"Where data centres use the most electricity","note":"Shade shows the data centre share of electricity where an official figure exists. Select a country, state or dot for the figure, year and source.","points_label":"Show AI campuses","points_legend":"AI campus (size by announced MW)","views":[{"id":"world","label":"World","title":"World map of data centre electricity figures","geo":"geo-world","regions":{"840|United States of America":{"t":"United States","v":4.4,"lines":["176 TWh in 2023","4.4% of national electricity (2023)","LBNL for US DOE. IEA puts the US at 45% of the world total in 2024."],"src":"https:\/\/www.energy.gov\/articles\/doe-releases-new-report-evaluating-increase-electricity-demand-data-centers","st":"Primary"},"156|China":{"t":"China","v":null,"lines":["About 25% of the world total of 415 TWh in 2024 (IEA). IEA sees an increase of about 175 TWh by 2030."],"src":"https:\/\/www.iea.org\/reports\/energy-and-ai\/energy-demand-from-ai","st":"Primary"},"392|Japan":{"t":"Japan","v":null,"lines":["IEA expects Japan to add about 15 TWh by 2030 (up 80%). OCCTO projects 49.4 TWh of new data centre demand by fiscal 2035."],"src":"https:\/\/www.iea.org\/reports\/energy-and-ai\/energy-demand-from-ai","st":"Primary"},"276|Germany":{"t":"Germany","v":4,"lines":["20 TWh in 2024","4% of national electricity (2024)","Data centres and smaller IT installations. 31 TWh expected in 2030 (BMWK study)."],"src":"https:\/\/www.bundeswirtschaftsministerium.de\/Redaktion\/EN\/Publikationen\/Digitale-Welt\/status-and-development-of-the-german-data-centre-landscape-executive-summary.pdf?__blob=publicationFile&v=2","st":"Primary"},"372|Ireland":{"t":"Ireland","v":23,"lines":["7.66 TWh in 2025","23% of national electricity (2025)","Metered consumption, up from 5% in 2015. Highest share of any country we track."],"src":"https:\/\/www.cso.ie\/en\/releasesandpublications\/ep\/p-dcmec\/datacentresmeteredelectricityconsumption2025\/keyfindings\/","st":"Primary"},"528|Netherlands":{"t":"Netherlands","v":4.6,"lines":["5.1 TWh in 2024","4.6% of national electricity (2024)","Provisional. Share rose from 1.5% in 2017."],"src":"https:\/\/www.cbs.nl\/en-gb\/news\/2025\/51\/data-centres-consume-4-6-percent-of-the-netherlands-electricity","st":"Primary"},"826|United Kingdom":{"t":"United Kingdom","v":2,"lines":["4.5 TWh in 2024","2% of national electricity (2024)","Great Britain, grid electricity; excludes enterprise data centres. 77% in London and the South East."],"src":"https:\/\/assets.publishing.service.gov.uk\/media\/6a3ea4334c7605ab56723bfd\/Data_centre_electricity_consumption_in_Great_Britain__2020_to_2024.pdf","st":"Primary"},"578|Norway":{"t":"Norway","v":null,"lines":["3.3 TWh in 2025","Doubled since 2023 (NVE)."],"src":"https:\/\/www.nve.no\/energi\/energisystem\/energibruk\/energibruk-i-datasenter\/","st":"Primary"},"208|Denmark":{"t":"Denmark","v":null,"lines":["Energistyrelsen assumes 1,240 MW of grid capacity for data centres by 2030 (AF23)."],"src":"https:\/\/ens.dk\/media\/4384\/download","st":"Primary"}},"points":[{"t":"Singapore","xy":[760.2,266.8],"lines":["7% of national electricity (2024)","7% of national electricity, stated by the Senior Minister of State in May 2024. Capacity above 1.4 GW (IMDA)."],"src":"https:\/\/www.mddi.gov.sg\/newsroom\/opening-by-sms-janil-puthucheary-at-atxsummit-digital-sustainability-forum\/","st":"Primary"}],"scale":[2,4,10,20],"unit":"%","info_label":"Official figure, no share"},{"id":"us","label":"United States","title":"US states by data centre share of electricity, 2023, with AI campuses","geo":"geo-us","regions":{"Virginia":{"t":"Virginia","v":25.59,"lines":["25.59% of the state's electricity went to data centres in 2023","33.85 TWh"],"src":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","st":"Primary"},"Texas":{"t":"Texas","v":4.59,"lines":["4.59% of the state's electricity went to data centres in 2023","21.81 TWh"],"src":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","st":"Primary"},"California":{"t":"California","v":3.7,"lines":["3.7% of the state's electricity went to data centres in 2023","9.33 TWh"],"src":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","st":"Primary"},"Illinois":{"t":"Illinois","v":5.48,"lines":["5.48% of the state's electricity went to data centres in 2023","7.45 TWh"],"src":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","st":"Primary"},"Oregon":{"t":"Oregon","v":11.39,"lines":["11.39% of the state's electricity went to data centres in 2023","6.41 TWh"],"src":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","st":"Primary"},"Arizona":{"t":"Arizona","v":7.43,"lines":["7.43% of the state's electricity went to data centres in 2023","6.25 TWh"],"src":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","st":"Primary"},"Iowa":{"t":"Iowa","v":11.43,"lines":["11.43% of the state's electricity went to data centres in 2023","6.19 TWh"],"src":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","st":"Primary"},"Georgia":{"t":"Georgia","v":4.26,"lines":["4.26% of the state's electricity went to data centres in 2023","6.18 TWh"],"src":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","st":"Primary"},"Washington":{"t":"Washington","v":5.69,"lines":["5.69% of the state's electricity went to data centres in 2023","5.17 TWh"],"src":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","st":"Primary"},"Pennsylvania":{"t":"Pennsylvania","v":3.16,"lines":["3.16% of the state's electricity went to data centres in 2023","4.59 TWh"],"src":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","st":"Primary"},"New York":{"t":"New York","v":2.84,"lines":["2.84% of the state's electricity went to data centres in 2023","4.07 TWh"],"src":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","st":"Primary"},"New Jersey":{"t":"New Jersey","v":5.42,"lines":["5.42% of the state's electricity went to data centres in 2023","4.04 TWh"],"src":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","st":"Primary"},"Nebraska":{"t":"Nebraska","v":11.7,"lines":["11.7% of the state's electricity went to data centres in 2023","3.96 TWh"],"src":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","st":"Primary"},"North Dakota":{"t":"North Dakota","v":15.42,"lines":["15.42% of the state's electricity went to data centres in 2023","3.92 TWh"],"src":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","st":"Primary"},"Nevada":{"t":"Nevada","v":8.69,"lines":["8.69% of the state's electricity went to data centres in 2023","3.42 TWh"],"src":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","st":"Primary"},"North Carolina":{"t":"North Carolina","v":1.92,"lines":["1.92% of the state's electricity went to data centres in 2023","2.67 TWh"],"src":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","st":"Primary"},"Utah":{"t":"Utah","v":7.68,"lines":["7.68% of the state's electricity went to data centres in 2023","2.56 TWh"],"src":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","st":"Primary"},"Ohio":{"t":"Ohio","v":1.58,"lines":["1.58% of the state's electricity went to data centres in 2023","2.36 TWh"],"src":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","st":"Primary"},"South Carolina":{"t":"South Carolina","v":2.45,"lines":["2.45% of the state's electricity went to data centres in 2023","2.02 TWh"],"src":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","st":"Primary"},"Wyoming":{"t":"Wyoming","v":11.26,"lines":["11.26% of the state's electricity went to data centres in 2023","1.86 TWh"],"src":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","st":"Primary"},"Kentucky":{"t":"Kentucky","v":2.15,"lines":["2.15% of the state's electricity went to data centres in 2023","1.62 TWh"],"src":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","st":"Primary"},"Colorado":{"t":"Colorado","v":2.66,"lines":["2.66% of the state's electricity went to data centres in 2023","1.51 TWh"],"src":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","st":"Primary"},"Florida":{"t":"Florida","v":0.56,"lines":["0.56% of the state's electricity went to data centres in 2023","1.38 TWh"],"src":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","st":"Primary"},"Tennessee":{"t":"Tennessee","v":1.3,"lines":["1.3% of the state's electricity went to data centres in 2023","1.33 TWh"],"src":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","st":"Primary"},"Oklahoma":{"t":"Oklahoma","v":1.76,"lines":["1.76% of the state's electricity went to data centres in 2023","1.23 TWh"],"src":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","st":"Primary"},"Massachusetts":{"t":"Massachusetts","v":2.08,"lines":["2.08% of the state's electricity went to data centres in 2023","1.06 TWh"],"src":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","st":"Primary"},"Missouri":{"t":"Missouri","v":1.21,"lines":["1.21% of the state's electricity went to data centres in 2023","0.97 TWh"],"src":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","st":"Primary"},"Minnesota":{"t":"Minnesota","v":1.24,"lines":["1.24% of the state's electricity went to data centres in 2023","0.82 TWh"],"src":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","st":"Primary"},"Montana":{"t":"Montana","v":3.71,"lines":["3.71% of the state's electricity went to data centres in 2023","0.58 TWh"],"src":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","st":"Primary"},"Michigan":{"t":"Michigan","v":0.52,"lines":["0.52% of the state's electricity went to data centres in 2023","0.53 TWh"],"src":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","st":"Primary"},"New Mexico":{"t":"New Mexico","v":1.48,"lines":["1.48% of the state's electricity went to data centres in 2023","0.4 TWh"],"src":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","st":"Primary"},"Connecticut":{"t":"Connecticut","v":0.95,"lines":["0.95% of the state's electricity went to data centres in 2023","0.26 TWh"],"src":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","st":"Primary"},"Indiana":{"t":"Indiana","v":0.19,"lines":["0.19% of the state's electricity went to data centres in 2023","0.19 TWh"],"src":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","st":"Primary"},"Idaho":{"t":"Idaho","v":0.57,"lines":["0.57% of the state's electricity went to data centres in 2023","0.15 TWh"],"src":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","st":"Primary"},"Wisconsin":{"t":"Wisconsin","v":0.21,"lines":["0.21% of the state's electricity went to data centres in 2023","0.15 TWh"],"src":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","st":"Primary"},"Maryland":{"t":"Maryland","v":0.16,"lines":["0.16% of the state's electricity went to data centres in 2023","0.1 TWh"],"src":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","st":"Primary"},"Louisiana":{"t":"Louisiana","v":0.08,"lines":["0.08% of the state's electricity went to data centres in 2023","0.08 TWh"],"src":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","st":"Primary"},"South Dakota":{"t":"South Dakota","v":0.52,"lines":["0.52% of the state's electricity went to data centres in 2023","0.07 TWh"],"src":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","st":"Primary"},"Maine":{"t":"Maine","v":0.22,"lines":["0.22% of the state's electricity went to data centres in 2023","0.03 TWh"],"src":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","st":"Primary"},"New Hampshire":{"t":"New Hampshire","v":0.16,"lines":["0.16% of the state's electricity went to data centres in 2023","0.02 TWh"],"src":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","st":"Primary"},"Rhode Island":{"t":"Rhode Island","v":0.23,"lines":["0.23% of the state's electricity went to data centres in 2023","0.02 TWh"],"src":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","st":"Primary"},"Hawaii":{"t":"Hawaii","v":0.1,"lines":["0.1% of the state's electricity went to data centres in 2023","0.01 TWh"],"src":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","st":"Primary"},"Kansas":{"t":"Kansas","v":0.02,"lines":["0.02% of the state's electricity went to data centres in 2023","0.01 TWh"],"src":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","st":"Primary"}},"points":[{"t":"Stargate Abilene","xy":[427,447],"mw":null,"lines":["OpenAI, Oracle, Crusoe","Abilene, Texas","Flagship Stargate site; part of nearly 7 GW planned across Stargate sites","Operating, expanding"],"src":"https:\/\/openai.com\/index\/five-new-stargate-sites\/","st":"Primary"},{"t":"Stargate Shackelford County","xy":[434,441],"mw":null,"lines":["OpenAI, Oracle","Shackelford County, Texas","Oracle-developed sites together over 5.5 GW","Announced Sep 2025"],"src":"https:\/\/openai.com\/index\/five-new-stargate-sites\/","st":"Primary"},{"t":"Stargate Do\u00f1a Ana County","xy":[293,439],"mw":null,"lines":["OpenAI, Oracle","Do\u00f1a Ana County, New Mexico","Oracle-developed sites together over 5.5 GW","Announced Sep 2025"],"src":"https:\/\/openai.com\/index\/five-new-stargate-sites\/","st":"Primary"},{"t":"Stargate Lordstown","xy":[753,228],"mw":null,"lines":["OpenAI, SoftBank","Lordstown, Ohio","SoftBank sites together up to 1.5 GW","Announced Sep 2025"],"src":"https:\/\/openai.com\/index\/five-new-stargate-sites\/","st":"Primary"},{"t":"Stargate Milam County","xy":[479,486],"mw":null,"lines":["OpenAI, SoftBank, SB Energy","Milam County, Texas","SoftBank sites together up to 1.5 GW","Announced Sep 2025"],"src":"https:\/\/openai.com\/index\/five-new-stargate-sites\/","st":"Primary"},{"t":"Hyperion","xy":[579,447],"mw":5000,"lines":["Meta","Richland Parish, Louisiana","Designed to scale to 5 GW over several years","Under construction"],"src":"https:\/\/techcrunch.com\/2025\/07\/14\/mark-zuckerberg-says-meta-is-building-a-5gw-ai-data-center\/","st":"Secondary"},{"t":"Prometheus","xy":[724,258],"mw":1000,"lines":["Meta","New Albany, Ohio","1 GW cluster, expected online in 2026","Coming online 2026"],"src":"https:\/\/techcrunch.com\/2025\/07\/14\/mark-zuckerberg-says-meta-is-building-a-5gw-ai-data-center\/","st":"Secondary"},{"t":"Colossus","xy":[608,385],"mw":null,"lines":["xAI","Memphis, Tennessee","200,000 H100 GPUs in one cluster, roadmap to 1 million GPUs; power not stated on the page","Operating"],"src":"https:\/\/x.ai\/colossus","st":"Primary"},{"t":"Fairwater","xy":[632,208],"mw":null,"lines":["Microsoft","Mount Pleasant, Wisconsin","315 acres, three buildings, 1.2 million sq ft; power not stated","Operating 2026"],"src":"https:\/\/blogs.microsoft.com\/blog\/2025\/09\/18\/inside-the-worlds-most-powerful-ai-datacenter\/","st":"Primary"},{"t":"Fairwater Atlanta","xy":[715,405],"mw":null,"lines":["Microsoft","Atlanta, Georgia","Second Fairwater site, linked to Wisconsin by an AI WAN","Operating"],"src":"https:\/\/blogs.microsoft.com\/blog\/2025\/11\/12\/infinite-scale-the-architecture-behind-the-azure-ai-superfactory\/","st":"Primary"},{"t":"Project Rainier","xy":[657,228],"mw":2200,"lines":["Amazon (for Anthropic)","New Carlisle, Indiana","More than 2.2 GW at full build, 1,200 acres","Operating, expanding"],"src":"https:\/\/www.cnbc.com\/2025\/10\/29\/amazon-opens-11-billion-ai-data-center-project-rainier-in-indiana.html","st":"Secondary"}],"scale":[2,4,8,12,20],"unit":"%","pt_scale":1.1}]},{"id":"forecast","type":"switch","title":"Forecast to 2030 and 2035","label":"Choose a forecast","charts":["world","scen2035","us","growth2030"],"labels":{"world":"World","scen2035":"2035 scenarios","us":"United States","growth2030":"Growth by region"},"captions":{"world":"IEA estimates for 2024 and 2025, Base Case projections for 2030 and 2035.","scen2035":"Lift-Off is described by the IEA as more than 1,700 TWh.","us":"LBNL range for 2028 depends on chip shipments, cooling and utilisation.","growth2030":"IEA Base Case: the US adds about 240 TWh (up 130%), China about 175 TWh (up 170%)."}},{"id":"compare","type":"switch","title":"Data centres compared with whole countries","note":"National figures are total electricity generation from Ember, used as a size reference. Data centre figures are consumption.","label":"Choose a comparison","charts":["cmp-all","cmp-ai"],"labels":{"cmp-all":"All data centres","cmp-ai":"AI-focused only"}},{"id":"prompt","type":"calc","title":"Energy per prompt calculator","note":"Only officially disclosed figures. Companies measure differently, so do not rank models by these numbers. Not disclosed means the company has not published that value.","inputs":[{"id":"m","type":"select","label":"Disclosure","options":[{"label":"Google Gemini Apps, median text prompt","vals":{"wh":0.24,"ml":0.26,"g":0.03},"sub":"Comprehensive: active accelerators, host CPU and RAM, idle capacity and data centre overhead (PUE). May 2025 measurement.","source":"https:\/\/cloud.google.com\/blog\/products\/infrastructure\/measuring-the-environmental-impact-of-ai-inference"},{"label":"Google Gemini Apps, active machine only","vals":{"wh":0.1,"ml":null,"g":null},"sub":"Narrow method that counts only active TPU and GPU use. Google publishes it to show how method changes the number.","source":"https:\/\/cloud.google.com\/blog\/products\/infrastructure\/measuring-the-environmental-impact-of-ai-inference"},{"label":"ChatGPT, average query","vals":{"wh":0.34,"ml":0.32,"g":null},"sub":"Stated by OpenAI CEO Sam Altman in June 2025 (0.000085 gallons of water). No method published.","source":"https:\/\/blog.samaltman.com\/the-gentle-singularity"},{"label":"Mistral Large 2, 400-token response","vals":{"wh":null,"ml":45,"g":1.14},"sub":"Life-cycle analysis with ADEME and Carbone 4, includes training and hardware share. Energy per response not published.","source":"https:\/\/mistral.ai\/news\/our-contribution-to-a-global-environmental-standard-for-ai\/"}]},{"id":"n","type":"range","label":"Prompts per day","min":1,"max":500,"step":1,"value":20},{"id":"p","type":"range","label":"People doing the same","unit":"million","min":1,"max":1000,"step":1,"value":100}],"outputs":[{"label":"Electricity per day","mul":["m.wh","n"],"dec":1,"unit":"Wh"},{"label":"A 10 W LED bulb would run for","mul":["m.wh","n"],"k":6,"dec":0,"unit":"minutes"},{"label":"Water per day","mul":["m.ml","n"],"dec":1,"unit":"mL"},{"label":"Emissions per year","mul":["m.g","n"],"k":365,"dec":0,"unit":"g CO2e"},{"label":"All those people, per year","mul":["m.wh","n","p"],"k":0.365,"dec":0,"unit":"GWh"},{"label":"Share of 2025 world data centre use","mul":["m.wh","n","p"],"k":7.525773195876289e-5,"dec":2,"unit":"%"}]},{"id":"prompt-table","type":"table","title":"Per-prompt disclosures","table":"prompt"},{"id":"mix","type":"stack","title":"Power mix of data centres today","unit":"%","note":"IEA estimate of the electricity supplying data centres worldwide (2024). Other is the remainder to 100.","items":[{"label":"Coal","v":30},{"label":"Renewables","v":27},{"label":"Natural gas","v":26},{"label":"Nuclear","v":15},{"label":"Other","v":2}]},{"id":"mix-text","type":"text","title":"Where the new power comes from","html":"<p>The IEA expects generation supplying data centres to grow from 460 TWh in 2024 to more than 1,000 TWh in 2030 and 1,300 TWh in 2035. Renewables meet nearly half of the extra demand, and natural gas adds about 175 TWh by 2035. Big tech is also signing nuclear and clean power contracts directly: see every deal in our <a href=\"{{url.big-tech-energy-deals}}\">Big Tech Energy Deals tracker<\/a>.<\/p>"},{"id":"national","type":"switch","title":"National time series","label":"Choose a country","charts":["ireland","netherlands"],"labels":{"ireland":"Ireland","netherlands":"Netherlands"}},{"id":"states-charts","type":"switch","title":"US states","label":"Choose a measure","charts":["states","states-twh"],"labels":{"states":"Share of electricity","states-twh":"TWh"}},{"id":"companies","type":"switch","title":"Big tech electricity use","note":"As reported in each company sustainability report. Google reports data centres only; Microsoft and Meta report company totals, which are mostly data centres.","label":"Choose a company","charts":["co-google","co-microsoft","co-meta"],"labels":{"co-google":"Google","co-microsoft":"Microsoft","co-meta":"Meta"}},{"id":"water","type":"charts","title":"Water","charts":["ms-water"],"note":"Only officially reported figures. Scopes differ: Google and Meta report data centres, Microsoft reports the whole company."},{"id":"water-table","type":"table","title":"Reported water consumption","table":"water"},{"id":"countries","type":"table","title":"Countries","table":"countries"},{"id":"states-table","type":"table","title":"All US states with EPRI figures","table":"states"},{"id":"campuses","type":"table","title":"AI campuses","table":"campuses","note":"Sizes as announced by the operators. Three rows rely on press reports and are marked Secondary."},{"id":"fc-table","type":"table","title":"Forecast figures","table":"forecasts"},{"id":"co-table","type":"table","title":"Company electricity series","table":"company"}],"tables":[{"id":"countries","rowhead":"country","columns":[{"k":"country","label":"Country","type":"text"},{"k":"twh","label":"TWh","type":"raw"},{"k":"share","label":"Share %","type":"pct"},{"k":"year","label":"Year","type":"text"},{"k":"note","label":"Note","type":"text"},{"k":"source","label":"Source","type":"src"}],"rows":[{"country":"United States","twh":176,"share":4.4,"year":2023,"note":"LBNL for US DOE. IEA puts the US at 45% of the world total in 2024.","source":"https:\/\/www.energy.gov\/articles\/doe-releases-new-report-evaluating-increase-electricity-demand-data-centers","source_type":"Primary"},{"country":"China","twh":null,"share":null,"year":2024,"note":"About 25% of the world total of 415 TWh in 2024 (IEA). IEA sees an increase of about 175 TWh by 2030.","source":"https:\/\/www.iea.org\/reports\/energy-and-ai\/energy-demand-from-ai","source_type":"Primary"},{"country":"Japan","twh":null,"share":null,"year":2024,"note":"IEA expects Japan to add about 15 TWh by 2030 (up 80%). OCCTO projects 49.4 TWh of new data centre demand by fiscal 2035.","source":"https:\/\/www.iea.org\/reports\/energy-and-ai\/energy-demand-from-ai","source_type":"Primary"},{"country":"Germany","twh":20,"share":4,"year":2024,"note":"Data centres and smaller IT installations. 31 TWh expected in 2030 (BMWK study).","source":"https:\/\/www.bundeswirtschaftsministerium.de\/Redaktion\/EN\/Publikationen\/Digitale-Welt\/status-and-development-of-the-german-data-centre-landscape-executive-summary.pdf?__blob=publicationFile&v=2","source_type":"Primary"},{"country":"Ireland","twh":7.663,"share":23,"year":2025,"note":"Metered consumption, up from 5% in 2015. Highest share of any country we track.","source":"https:\/\/www.cso.ie\/en\/releasesandpublications\/ep\/p-dcmec\/datacentresmeteredelectricityconsumption2025\/keyfindings\/","source_type":"Primary"},{"country":"Netherlands","twh":5.1,"share":4.6,"year":2024,"note":"Provisional. Share rose from 1.5% in 2017.","source":"https:\/\/www.cbs.nl\/en-gb\/news\/2025\/51\/data-centres-consume-4-6-percent-of-the-netherlands-electricity","source_type":"Primary"},{"country":"United Kingdom","twh":4.5,"share":2,"year":2024,"note":"Great Britain, grid electricity; excludes enterprise data centres. 77% in London and the South East.","source":"https:\/\/assets.publishing.service.gov.uk\/media\/6a3ea4334c7605ab56723bfd\/Data_centre_electricity_consumption_in_Great_Britain__2020_to_2024.pdf","source_type":"Primary"},{"country":"Norway","twh":3.3,"share":null,"year":2025,"note":"Doubled since 2023 (NVE).","source":"https:\/\/www.nve.no\/energi\/energisystem\/energibruk\/energibruk-i-datasenter\/","source_type":"Primary"},{"country":"Singapore","twh":null,"share":7,"year":2024,"note":"7% of national electricity, stated by the Senior Minister of State in May 2024. Capacity above 1.4 GW (IMDA).","source":"https:\/\/www.mddi.gov.sg\/newsroom\/opening-by-sms-janil-puthucheary-at-atxsummit-digital-sustainability-forum\/","source_type":"Primary"},{"country":"Denmark","twh":null,"share":null,"year":2030,"note":"Energistyrelsen assumes 1,240 MW of grid capacity for data centres by 2030 (AF23).","source":"https:\/\/ens.dk\/media\/4384\/download","source_type":"Primary"}]},{"id":"states","rowhead":"state","limit":15,"columns":[{"k":"state","label":"State","type":"text"},{"k":"twh","label":"TWh, 2023","type":"raw"},{"k":"share","label":"Share of state electricity, %","type":"raw"},{"k":"source","label":"Source","type":"src"}],"rows":[{"state":"Virginia","twh":33.851,"share":25.59,"source":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","source_type":"Primary"},{"state":"Texas","twh":21.813,"share":4.59,"source":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","source_type":"Primary"},{"state":"California","twh":9.332,"share":3.7,"source":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","source_type":"Primary"},{"state":"Illinois","twh":7.45,"share":5.48,"source":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","source_type":"Primary"},{"state":"Oregon","twh":6.414,"share":11.39,"source":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","source_type":"Primary"},{"state":"Arizona","twh":6.253,"share":7.43,"source":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","source_type":"Primary"},{"state":"Iowa","twh":6.193,"share":11.43,"source":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","source_type":"Primary"},{"state":"Georgia","twh":6.175,"share":4.26,"source":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","source_type":"Primary"},{"state":"Washington","twh":5.172,"share":5.69,"source":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","source_type":"Primary"},{"state":"Pennsylvania","twh":4.59,"share":3.16,"source":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","source_type":"Primary"},{"state":"New York","twh":4.067,"share":2.84,"source":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","source_type":"Primary"},{"state":"New Jersey","twh":4.038,"share":5.42,"source":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","source_type":"Primary"},{"state":"Nebraska","twh":3.96,"share":11.7,"source":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","source_type":"Primary"},{"state":"North Dakota","twh":3.916,"share":15.42,"source":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","source_type":"Primary"},{"state":"Nevada","twh":3.417,"share":8.69,"source":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","source_type":"Primary"},{"state":"North Carolina","twh":2.673,"share":1.92,"source":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","source_type":"Primary"},{"state":"Utah","twh":2.562,"share":7.68,"source":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","source_type":"Primary"},{"state":"Ohio","twh":2.364,"share":1.58,"source":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","source_type":"Primary"},{"state":"South Carolina","twh":2.024,"share":2.45,"source":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","source_type":"Primary"},{"state":"Wyoming","twh":1.857,"share":11.26,"source":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","source_type":"Primary"},{"state":"Kentucky","twh":1.621,"share":2.15,"source":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","source_type":"Primary"},{"state":"Colorado","twh":1.51,"share":2.66,"source":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","source_type":"Primary"},{"state":"Florida","twh":1.384,"share":0.56,"source":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","source_type":"Primary"},{"state":"Tennessee","twh":1.327,"share":1.3,"source":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","source_type":"Primary"},{"state":"Oklahoma","twh":1.226,"share":1.76,"source":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","source_type":"Primary"},{"state":"Massachusetts","twh":1.062,"share":2.08,"source":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","source_type":"Primary"},{"state":"Missouri","twh":0.972,"share":1.21,"source":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","source_type":"Primary"},{"state":"Minnesota","twh":0.824,"share":1.24,"source":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","source_type":"Primary"},{"state":"Montana","twh":0.578,"share":3.71,"source":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","source_type":"Primary"},{"state":"Michigan","twh":0.526,"share":0.52,"source":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","source_type":"Primary"},{"state":"New Mexico","twh":0.403,"share":1.48,"source":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","source_type":"Primary"},{"state":"Connecticut","twh":0.263,"share":0.95,"source":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","source_type":"Primary"},{"state":"Indiana","twh":0.193,"share":0.19,"source":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","source_type":"Primary"},{"state":"Idaho","twh":0.149,"share":0.57,"source":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","source_type":"Primary"},{"state":"Wisconsin","twh":0.149,"share":0.21,"source":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","source_type":"Primary"},{"state":"Maryland","twh":0.096,"share":0.16,"source":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","source_type":"Primary"},{"state":"Louisiana","twh":0.079,"share":0.08,"source":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","source_type":"Primary"},{"state":"South Dakota","twh":0.07,"share":0.52,"source":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","source_type":"Primary"},{"state":"Maine","twh":0.026,"share":0.22,"source":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","source_type":"Primary"},{"state":"New Hampshire","twh":0.018,"share":0.16,"source":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","source_type":"Primary"},{"state":"Rhode Island","twh":0.018,"share":0.23,"source":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","source_type":"Primary"},{"state":"Hawaii","twh":0.009,"share":0.1,"source":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","source_type":"Primary"},{"state":"Kansas","twh":0.009,"share":0.02,"source":"https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","source_type":"Primary"}]},{"id":"campuses","rowhead":"campus","filters":["operator"],"columns":[{"k":"campus","label":"Campus","type":"text"},{"k":"operator","label":"Operator","type":"text"},{"k":"place","label":"Location","type":"text"},{"k":"mw","label":"MW","type":"num"},{"k":"size","label":"Size as announced","type":"text"},{"k":"status","label":"Status","type":"text"},{"k":"source","label":"Source","type":"src"}],"rows":[{"campus":"Stargate Abilene","operator":"OpenAI, Oracle, Crusoe","place":"Abilene, Texas","mw":null,"size":"Flagship Stargate site; part of nearly 7 GW planned across Stargate sites","status":"Operating, expanding","source":"https:\/\/openai.com\/index\/five-new-stargate-sites\/","source_type":"Primary"},{"campus":"Stargate Shackelford County","operator":"OpenAI, Oracle","place":"Shackelford County, Texas","mw":null,"size":"Oracle-developed sites together over 5.5 GW","status":"Announced Sep 2025","source":"https:\/\/openai.com\/index\/five-new-stargate-sites\/","source_type":"Primary"},{"campus":"Stargate Do\u00f1a Ana County","operator":"OpenAI, Oracle","place":"Do\u00f1a Ana County, New Mexico","mw":null,"size":"Oracle-developed sites together over 5.5 GW","status":"Announced Sep 2025","source":"https:\/\/openai.com\/index\/five-new-stargate-sites\/","source_type":"Primary"},{"campus":"Stargate Lordstown","operator":"OpenAI, SoftBank","place":"Lordstown, Ohio","mw":null,"size":"SoftBank sites together up to 1.5 GW","status":"Announced Sep 2025","source":"https:\/\/openai.com\/index\/five-new-stargate-sites\/","source_type":"Primary"},{"campus":"Stargate Milam County","operator":"OpenAI, SoftBank, SB Energy","place":"Milam County, Texas","mw":null,"size":"SoftBank sites together up to 1.5 GW","status":"Announced Sep 2025","source":"https:\/\/openai.com\/index\/five-new-stargate-sites\/","source_type":"Primary"},{"campus":"Hyperion","operator":"Meta","place":"Richland Parish, Louisiana","mw":5000,"size":"Designed to scale to 5 GW over several years","status":"Under construction","source":"https:\/\/techcrunch.com\/2025\/07\/14\/mark-zuckerberg-says-meta-is-building-a-5gw-ai-data-center\/","source_type":"Secondary"},{"campus":"Prometheus","operator":"Meta","place":"New Albany, Ohio","mw":1000,"size":"1 GW cluster, expected online in 2026","status":"Coming online 2026","source":"https:\/\/techcrunch.com\/2025\/07\/14\/mark-zuckerberg-says-meta-is-building-a-5gw-ai-data-center\/","source_type":"Secondary"},{"campus":"Colossus","operator":"xAI","place":"Memphis, Tennessee","mw":null,"size":"200,000 H100 GPUs in one cluster, roadmap to 1 million GPUs; power not stated on the page","status":"Operating","source":"https:\/\/x.ai\/colossus","source_type":"Primary"},{"campus":"Fairwater","operator":"Microsoft","place":"Mount Pleasant, Wisconsin","mw":null,"size":"315 acres, three buildings, 1.2 million sq ft; power not stated","status":"Operating 2026","source":"https:\/\/blogs.microsoft.com\/blog\/2025\/09\/18\/inside-the-worlds-most-powerful-ai-datacenter\/","source_type":"Primary"},{"campus":"Fairwater Atlanta","operator":"Microsoft","place":"Atlanta, Georgia","mw":null,"size":"Second Fairwater site, linked to Wisconsin by an AI WAN","status":"Operating","source":"https:\/\/blogs.microsoft.com\/blog\/2025\/11\/12\/infinite-scale-the-architecture-behind-the-azure-ai-superfactory\/","source_type":"Primary"},{"campus":"Project Rainier","operator":"Amazon (for Anthropic)","place":"New Carlisle, Indiana","mw":2200,"size":"More than 2.2 GW at full build, 1,200 acres","status":"Operating, expanding","source":"https:\/\/www.cnbc.com\/2025\/10\/29\/amazon-opens-11-billion-ai-data-center-project-rainier-in-indiana.html","source_type":"Secondary"}]},{"id":"prompt","rowhead":"model","columns":[{"k":"model","label":"Model and unit","type":"text"},{"k":"wh","label":"Wh","type":"raw"},{"k":"ml","label":"Water mL","type":"raw"},{"k":"g","label":"g CO2e","type":"raw"},{"k":"scope","label":"What it covers","type":"text"},{"k":"source","label":"Source","type":"src"}],"rows":[{"model":"Google Gemini Apps, median text prompt","wh":0.24,"ml":0.26,"g":0.03,"scope":"Comprehensive: active accelerators, host CPU and RAM, idle capacity and data centre overhead (PUE). May 2025 measurement.","source":"https:\/\/cloud.google.com\/blog\/products\/infrastructure\/measuring-the-environmental-impact-of-ai-inference","source_type":"Primary"},{"model":"Google Gemini Apps, active machine only","wh":0.1,"ml":null,"g":null,"scope":"Narrow method that counts only active TPU and GPU use. Google publishes it to show how method changes the number.","source":"https:\/\/cloud.google.com\/blog\/products\/infrastructure\/measuring-the-environmental-impact-of-ai-inference","source_type":"Primary"},{"model":"ChatGPT, average query","wh":0.34,"ml":0.32,"g":null,"scope":"Stated by OpenAI CEO Sam Altman in June 2025 (0.000085 gallons of water). No method published.","source":"https:\/\/blog.samaltman.com\/the-gentle-singularity","source_type":"Primary"},{"model":"Mistral Large 2, 400-token response","wh":null,"ml":45,"g":1.14,"scope":"Life-cycle analysis with ADEME and Carbone 4, includes training and hardware share. Energy per response not published.","source":"https:\/\/mistral.ai\/news\/our-contribution-to-a-global-environmental-standard-for-ai\/","source_type":"Primary"}]},{"id":"water","rowhead":"company","columns":[{"k":"company","label":"Company","type":"text"},{"k":"what","label":"Measure","type":"text"},{"k":"value","label":"Reported","type":"num"},{"k":"unit","label":"Unit","type":"text"},{"k":"ml","label":"Megalitres","type":"num"},{"k":"source","label":"Source","type":"src"}],"rows":[{"company":"Google","what":"Data centre water consumption, 2025","value":10523,"unit":"million gallons","ml":39834,"source":"https:\/\/sustainability.google\/files\/google-2026-environmental-report.pdf","source_type":"Primary"},{"company":"Microsoft","what":"Total water consumption, FY25","value":8170,"unit":"megalitres","ml":8170,"source":"https:\/\/cdn-dynmedia-1.microsoft.com\/is\/content\/microsoftcorp\/microsoft\/msc\/documents\/presentations\/CSR\/2026-Microsoft-Environmental-Data-Fact-Sheet-PDF.pdf","source_type":"Primary"},{"company":"Meta","what":"Data centre water consumption, 2024","value":2974,"unit":"megalitres","ml":2974,"source":"https:\/\/sustainability.atmeta.com\/wp-content\/uploads\/2025\/10\/Meta_2025-Environmental-Data-Index.pdf","source_type":"Primary"}]},{"id":"forecasts","filters":["series"],"columns":[{"k":"series","label":"Area","type":"text"},{"k":"year","label":"Year","type":"text"},{"k":"twh","label":"TWh","type":"num"},{"k":"kind","label":"Type","type":"text"},{"k":"source","label":"Source","type":"src"}],"rows":[{"series":"World","year":"2024","twh":415,"kind":"Estimate","source":"https:\/\/www.iea.org\/reports\/energy-and-ai\/executive-summary","source_type":"Primary"},{"series":"World","year":"2025","twh":485,"kind":"Estimate","source":"https:\/\/www.iea.org\/reports\/key-questions-on-energy-and-ai\/executive-summary","source_type":"Primary"},{"series":"World","year":"2030","twh":945,"kind":"IEA Base Case (2025 report)","source":"https:\/\/www.iea.org\/reports\/energy-and-ai\/executive-summary","source_type":"Primary"},{"series":"World","year":"2030","twh":950,"kind":"IEA projection (2026 update)","source":"https:\/\/www.iea.org\/reports\/key-questions-on-energy-and-ai\/executive-summary","source_type":"Primary"},{"series":"World","year":"2035","twh":700,"kind":"Headwinds case","source":"https:\/\/www.iea.org\/reports\/energy-and-ai\/energy-demand-from-ai","source_type":"Primary"},{"series":"World","year":"2035","twh":970,"kind":"High Efficiency case","source":"https:\/\/www.iea.org\/reports\/energy-and-ai\/energy-demand-from-ai","source_type":"Primary"},{"series":"World","year":"2035","twh":1200,"kind":"Base Case","source":"https:\/\/www.iea.org\/reports\/energy-and-ai\/energy-demand-from-ai","source_type":"Primary"},{"series":"World","year":"2035","twh":1700,"kind":"Lift-Off case (more than)","source":"https:\/\/www.iea.org\/reports\/energy-and-ai\/energy-demand-from-ai","source_type":"Primary"},{"series":"United States","year":"2014","twh":58,"kind":"Estimate","source":"https:\/\/www.energy.gov\/articles\/doe-releases-new-report-evaluating-increase-electricity-demand-data-centers","source_type":"Primary"},{"series":"United States","year":"2023","twh":176,"kind":"Estimate","source":"https:\/\/www.energy.gov\/articles\/doe-releases-new-report-evaluating-increase-electricity-demand-data-centers","source_type":"Primary"},{"series":"United States","year":"2028","twh":325,"kind":"LBNL low scenario","source":"https:\/\/www.energy.gov\/articles\/doe-releases-new-report-evaluating-increase-electricity-demand-data-centers","source_type":"Primary"},{"series":"United States","year":"2028","twh":580,"kind":"LBNL high scenario","source":"https:\/\/www.energy.gov\/articles\/doe-releases-new-report-evaluating-increase-electricity-demand-data-centers","source_type":"Primary"}]},{"id":"company","filters":["company"],"columns":[{"k":"company","label":"Company","type":"text"},{"k":"metric","label":"Measure","type":"text"},{"k":"period","label":"Period","type":"text"},{"k":"twh","label":"TWh","type":"num"},{"k":"source","label":"Source","type":"src"}],"rows":[{"company":"Google","metric":"Data centre electricity (TWh)","period":"2021","twh":17.43,"source":"https:\/\/sustainability.google\/files\/google-2026-environmental-report.pdf","source_type":"Primary"},{"company":"Google","metric":"Data centre electricity (TWh)","period":"2022","twh":20.62,"source":"https:\/\/sustainability.google\/files\/google-2026-environmental-report.pdf","source_type":"Primary"},{"company":"Google","metric":"Data centre electricity (TWh)","period":"2023","twh":23.98,"source":"https:\/\/sustainability.google\/files\/google-2026-environmental-report.pdf","source_type":"Primary"},{"company":"Google","metric":"Data centre electricity (TWh)","period":"2024","twh":30.64,"source":"https:\/\/sustainability.google\/files\/google-2026-environmental-report.pdf","source_type":"Primary"},{"company":"Google","metric":"Data centre electricity (TWh)","period":"2025","twh":42.42,"source":"https:\/\/sustainability.google\/files\/google-2026-environmental-report.pdf","source_type":"Primary"},{"company":"Microsoft","metric":"Total electricity (TWh, fiscal years)","period":"FY20","twh":10.77,"source":"https:\/\/cdn-dynmedia-1.microsoft.com\/is\/content\/microsoftcorp\/microsoft\/msc\/documents\/presentations\/CSR\/2026-Microsoft-Environmental-Data-Fact-Sheet-PDF.pdf","source_type":"Primary"},{"company":"Microsoft","metric":"Total electricity (TWh, fiscal years)","period":"FY21","twh":13.62,"source":"https:\/\/cdn-dynmedia-1.microsoft.com\/is\/content\/microsoftcorp\/microsoft\/msc\/documents\/presentations\/CSR\/2026-Microsoft-Environmental-Data-Fact-Sheet-PDF.pdf","source_type":"Primary"},{"company":"Microsoft","metric":"Total electricity (TWh, fiscal years)","period":"FY22","twh":18.15,"source":"https:\/\/cdn-dynmedia-1.microsoft.com\/is\/content\/microsoftcorp\/microsoft\/msc\/documents\/presentations\/CSR\/2026-Microsoft-Environmental-Data-Fact-Sheet-PDF.pdf","source_type":"Primary"},{"company":"Microsoft","metric":"Total electricity (TWh, fiscal years)","period":"FY23","twh":23.57,"source":"https:\/\/cdn-dynmedia-1.microsoft.com\/is\/content\/microsoftcorp\/microsoft\/msc\/documents\/presentations\/CSR\/2026-Microsoft-Environmental-Data-Fact-Sheet-PDF.pdf","source_type":"Primary"},{"company":"Microsoft","metric":"Total electricity (TWh, fiscal years)","period":"FY24","twh":29.83,"source":"https:\/\/cdn-dynmedia-1.microsoft.com\/is\/content\/microsoftcorp\/microsoft\/msc\/documents\/presentations\/CSR\/2026-Microsoft-Environmental-Data-Fact-Sheet-PDF.pdf","source_type":"Primary"},{"company":"Microsoft","metric":"Total electricity (TWh, fiscal years)","period":"FY25","twh":37.03,"source":"https:\/\/cdn-dynmedia-1.microsoft.com\/is\/content\/microsoftcorp\/microsoft\/msc\/documents\/presentations\/CSR\/2026-Microsoft-Environmental-Data-Fact-Sheet-PDF.pdf","source_type":"Primary"},{"company":"Meta","metric":"Total electricity (TWh)","period":"2020","twh":7.17,"source":"https:\/\/sustainability.atmeta.com\/wp-content\/uploads\/2025\/10\/Meta_2025-Environmental-Data-Index.pdf","source_type":"Primary"},{"company":"Meta","metric":"Total electricity (TWh)","period":"2021","twh":9.42,"source":"https:\/\/sustainability.atmeta.com\/wp-content\/uploads\/2025\/10\/Meta_2025-Environmental-Data-Index.pdf","source_type":"Primary"},{"company":"Meta","metric":"Total electricity (TWh)","period":"2022","twh":11.51,"source":"https:\/\/sustainability.atmeta.com\/wp-content\/uploads\/2025\/10\/Meta_2025-Environmental-Data-Index.pdf","source_type":"Primary"},{"company":"Meta","metric":"Total electricity (TWh)","period":"2023","twh":15.33,"source":"https:\/\/sustainability.atmeta.com\/wp-content\/uploads\/2025\/10\/Meta_2025-Environmental-Data-Index.pdf","source_type":"Primary"},{"company":"Meta","metric":"Total electricity (TWh)","period":"2024","twh":18.42,"source":"https:\/\/sustainability.atmeta.com\/wp-content\/uploads\/2025\/10\/Meta_2025-Environmental-Data-Index.pdf","source_type":"Primary"}]}],"extra_sources":["https:\/\/www.iea.org\/reports\/energy-and-ai\/executive-summary","https:\/\/www.iea.org\/reports\/energy-and-ai\/energy-demand-from-ai","https:\/\/www.iea.org\/reports\/energy-and-ai\/energy-supply-for-ai","https:\/\/www.iea.org\/reports\/key-questions-on-energy-and-ai\/executive-summary","https:\/\/www.energy.gov\/articles\/doe-releases-new-report-evaluating-increase-electricity-demand-data-centers","https:\/\/www.cso.ie\/en\/releasesandpublications\/ep\/p-dcmec\/datacentresmeteredelectricityconsumption2025\/keyfindings\/","https:\/\/www.cbs.nl\/en-gb\/news\/2025\/51\/data-centres-consume-4-6-percent-of-the-netherlands-electricity","https:\/\/assets.publishing.service.gov.uk\/media\/6a3ea4334c7605ab56723bfd\/Data_centre_electricity_consumption_in_Great_Britain__2020_to_2024.pdf","https:\/\/www.bundeswirtschaftsministerium.de\/Redaktion\/EN\/Publikationen\/Digitale-Welt\/status-and-development-of-the-german-data-centre-landscape-executive-summary.pdf?__blob=publicationFile&v=2","https:\/\/www.nve.no\/energi\/energisystem\/energibruk\/energibruk-i-datasenter\/","https:\/\/www.mddi.gov.sg\/newsroom\/opening-by-sms-janil-puthucheary-at-atxsummit-digital-sustainability-forum\/","https:\/\/ens.dk\/media\/4384\/download","https:\/\/www.occto.or.jp\/assets\/news\/juyousoutei\/260121_juyousoutei_r1.pdf","https:\/\/restservice.epri.com\/publicdownload\/000000003002028905\/0\/Product","https:\/\/ember-energy.org\/data\/yearly-electricity-data\/","https:\/\/cloud.google.com\/blog\/products\/infrastructure\/measuring-the-environmental-impact-of-ai-inference","https:\/\/blog.samaltman.com\/the-gentle-singularity","https:\/\/mistral.ai\/news\/our-contribution-to-a-global-environmental-standard-for-ai\/","https:\/\/sustainability.google\/files\/google-2026-environmental-report.pdf","https:\/\/cdn-dynmedia-1.microsoft.com\/is\/content\/microsoftcorp\/microsoft\/msc\/documents\/presentations\/CSR\/2026-Microsoft-Environmental-Data-Fact-Sheet-PDF.pdf","https:\/\/sustainability.atmeta.com\/wp-content\/uploads\/2025\/10\/Meta_2025-Environmental-Data-Index.pdf","https:\/\/blogs.microsoft.com\/blog\/2025\/09\/18\/inside-the-worlds-most-powerful-ai-datacenter\/","https:\/\/blogs.microsoft.com\/blog\/2025\/11\/12\/infinite-scale-the-architecture-behind-the-azure-ai-superfactory\/","https:\/\/openai.com\/index\/five-new-stargate-sites\/","https:\/\/techcrunch.com\/2025\/07\/14\/mark-zuckerberg-says-meta-is-building-a-5gw-ai-data-center\/","https:\/\/www.cnbc.com\/2025\/10\/29\/amazon-opens-11-billion-ai-data-center-project-rainier-in-indiana.html","https:\/\/x.ai\/colossus"],"preview":{"kpis":[["World, 2025","485 TWh"],["AI-focused","155 TWh"],["2030 outlook","950 TWh"]],"map":"map","map_view":"us"},"stored_at":"2026-11-16 16:29:01"}