{"id":9162,"date":"2026-11-16T13:35:28","date_gmt":"2026-11-16T13:35:28","guid":{"rendered":"https:\/\/i10xnews.kinsta.cloud\/constellation-amazon-add-nuclear-power-for-ai-at-calvert-cliffs"},"modified":"2026-11-16T13:40:38","modified_gmt":"2026-11-16T13:40:38","slug":"constellation-amazon-add-nuclear-power-for-ai-at-calvert-cliffs","status":"publish","type":"post","link":"https:\/\/i10x.ai\/news\/constellation-amazon-add-nuclear-power-for-ai-at-calvert-cliffs","title":{"rendered":"Constellation, Amazon Add Nuclear Power for AI at Calvert Cliffs"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Constellation Energy and Amazon announced a 20-year power purchase agreement on September 30, 2026, that will add approximately 190 megawatts of nuclear power for AI at Maryland&#8217;s Calvert Cliffs Clean Energy Center, the state&#8217;s only nuclear plant and largest source of clean energy, according to Constellation&#8217;s press release. The deal supports more than $3 billion in infrastructure investment, including state-of-the-art improvements across the entire 1,790-megawatt facility and new emissions-free generating capacity expected to come online between 2030 and 2032.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The agreement marks Amazon&#8217;s latest move to secure nuclear power for AI workloads after the company withdrew from a proposed on-site data center development at Calvert Cliffs amid local opposition. Under the new structure, all electricity generated by the plant will continue flowing to the PJM regional grid, demonstrating how large energy users can support investments in new, reliable generation while strengthening the broader electric system.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">\u26a1 Quick Take<\/h2>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>What happened:<\/strong> Constellation and Amazon signed a 20-year PPA adding 190 MW of nuclear capacity at Calvert Cliffs, with first power expected between 2030 and 2032.<\/li><li><strong>The investment:<\/strong> The deal enables more than $3 billion in infrastructure upgrades across the 1,790 MW Maryland nuclear plant.<\/li><li><strong>The structure:<\/strong> Amazon&#8217;s agreement includes 690 MW of total power, comprising the 190 MW uprate plus existing generation, along with a retail supply agreement for operations across the 13-state PJM market.<\/li><li><strong>The timeline:<\/strong> New capacity will be delivered in phases starting in 2030, with full completion by 2032.<\/li><li><strong>The context:<\/strong> The deal follows Amazon&#8217;s pivot from a proposed on-site data center at Calvert Cliffs to a grid-supply model after facing local opposition.<\/li><\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">In plain English<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Amazon is paying Constellation to upgrade an existing nuclear plant in Maryland, adding about 190 megawatts of new generating capacity over the next six years. That is enough electricity to power roughly 150,000 homes, though the power will flow into the regional grid rather than directly to Amazon facilities. The arrangement lets Amazon secure long-term clean energy for its AI data centers without building new reactors from scratch. Constellation gets the revenue certainty to invest billions in plant improvements and extend the facility&#8217;s operating license for another 20 years. The first new megawatts arrive in 2030, so this solves a medium-term power problem, not an immediate one.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What happened<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Constellation Energy and Amazon Web Services announced the long-term agreement on September 30, 2026, supporting the continued investment in and expansion of the Calvert Cliffs Clean Energy Center in Lusby, Maryland. The 20-year power purchase agreement includes 690 megawatts of power in total, comprising the 190 megawatt uprate and existing generation from the facility, according to the company announcement.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The parties also entered into a related retail supply agreement to support Amazon operations across the 13-state PJM market. In addition to making the uprate possible, Amazon&#8217;s long-term commitment will help provide Constellation with the revenue certainty to relicense the plant for another 20 years and make progress toward the development of new clean energy power plants at the site.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Kerry Person, vice president of AWS Global Operations and Data Center Delivery, said Amazon is committed to investing in carbon-free energy to strengthen the grid and benefit the communities where the company operates. Joe Dominguez, Constellation&#8217;s chairman, president and chief executive officer, said the agreement demonstrates how private investment can strengthen critical energy infrastructure and creates a strong foundation for future investment in both the facility and in advanced nuclear technologies.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Located on the western shore of the Chesapeake Bay, Calvert Cliffs produces approximately 80 percent of Maryland&#8217;s clean energy and enough electricity to power the equivalent of more than 1.3 million homes. The facility employs more than 800 people and contributes about $21 million annually in taxes supporting schools, roads and other public services, according to Constellation.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The deal structure<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The Amazon nuclear agreement follows a different model than the company&#8217;s earlier attempt to secure power from Calvert Cliffs. Amazon had previously proposed developing a data center directly at the nuclear site, but that plan was withdrawn amid local opposition, according to Constellation and Amazon&#8217;s Calvert Cliffs announcement.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Under the new structure, all electricity generated by Calvert Cliffs will continue flowing to the PJM regional grid just as it does now. Amazon secures long-term power through the purchase agreement rather than through a dedicated on-site connection. This approach allows the company to support investments in new, reliable generation while strengthening the broader electric system, rather than carving out a portion of existing capacity for exclusive use.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The 190 MW uprate represents an incremental increase in the plant&#8217;s total generating capacity, achieved through equipment upgrades and technology improvements rather than construction of new reactor units. Nuclear uprates can increase generation without building new reactors, but equipment modifications, scheduled outages and regulatory approvals still impose multiyear delivery timelines, according to industry analysis.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Why it matters<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The Calvert Cliffs agreement is part of a broader wave of deals in which hyperscale technology companies are financing upgrades to existing nuclear plants to secure clean power for AI workloads. Just over a month after the Amazon announcement, <a href=\"https:\/\/i10x.ai\/news\/google-nuclear-power-deal-with-constellation-targets-890-mw\" target=\"_blank\" rel=\"noreferrer noopener\">Google signed a separate 20-year agreement with Constellation<\/a> supporting approximately 890 MW of new nuclear capacity across 11 reactor units in Illinois, Pennsylvania and New Jersey, with the first uprate expected in 2028.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Together, the Amazon and Google agreements underpin more than $7 billion in planned infrastructure investment and support approximately 1,080 MW of additional nuclear generating capacity from Constellation&#8217;s existing fleet. Meta has also backed hundreds of megawatts in planned uprates through separate agreements at operating nuclear facilities in Ohio, Pennsylvania and Illinois, establishing a commercial model in which tech companies help finance increases in nuclear output.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The approach offers advantages over building entirely new reactors. Existing facilities already have operating licenses, grid connections, established workforces and decades of operating experience. Increasing their output avoids some of the cost, permitting and construction challenges associated with new nuclear plants, although significant upgrades still require extensive engineering, equipment modifications and regulatory approval.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">According to the Nuclear Regulatory Commission&#8217;s current application schedule, the agency anticipates 31 applications for reactor power uprates through 2032, representing approximately 2,421 MW of potential additional electrical generating capacity, roughly equivalent to the output of two large nuclear reactors without constructing new reactor units. However, these figures represent anticipated applications, not approved projects or guaranteed additions to the grid.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The timeline and the catch<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For data center developers facing immediate power shortages, the Calvert Cliffs uprate offers no quick fix. The new capacity will be delivered in phases starting in 2030, with full completion by 2032. That timeline reflects the engineering, equipment procurement, regulatory review and scheduled outage coordination required for nuclear uprates.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Moreover, additional generation entering a regional transmission system does not necessarily resolve local power-delivery constraints. The electricity from Calvert Cliffs flows into the PJM grid, which serves 13 states and the District of Columbia. While that strengthens the overall system, it does not guarantee that specific Amazon data centers can draw the power they need at the times and locations they need it.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The distinction between securing electricity supply and securing deliverable power for individual facilities remains a formidable obstacle. FERC&#8217;s October 9, 2026, rejection of key elements of PJM&#8217;s large-load framework highlighted the continuing gap between financing additional generation and ensuring that power can be delivered to specific AI data centers, according to industry reporting.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Constellation reported in its third quarter 2026 earnings that the company also signed a conditional loan commitment with the Department of Energy Office of Energy Dominance Financing in October 2026. Subject to execution of a loan agreement, the DOE would issue a guarantee for up to $5 billion for an unsecured loan from the Federal Financing Bank to support uprates at various nuclear facilities, with a 30-year term and interest rates fixed at a spread of 0.375 percent above U.S. Treasuries of comparable maturity.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The broader power scramble<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The Calvert Cliffs deal is one piece of a larger scramble by AI companies to secure reliable electricity. While Amazon and Google are backing nuclear uprates, <a href=\"https:\/\/i10x.ai\/news\/anthropic-caterpillar-gas-generators-deal\" target=\"_blank\" rel=\"noreferrer noopener\">Anthropic signed a $3.4 billion deal with Caterpillar<\/a> for natural gas generators to power AI infrastructure, illustrating the range of strategies companies are pursuing.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Meanwhile, <a href=\"https:\/\/i10x.ai\/news\/texas-new-mexico-data-center-emissions-rise-with-ai\" target=\"_blank\" rel=\"noreferrer noopener\">data center emissions in Texas and New Mexico have risen sharply<\/a> as AI workloads grow, underscoring the tension between rapid deployment and decarbonization goals. Nuclear uprates offer a path to add clean baseload power, but the multiyear timelines mean companies must balance long-term investments in zero-carbon generation with near-term needs that may require fossil fuel backup.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Amazon nuclear agreement also reflects a shift in how utilities and large customers are structuring power deals. Constellation reported that it has signed a 20-year agreement for 270 MW under its new Peak+ product, an integrated solution that brings together new capacity, including new generation and demand response, with energy products to help large customers meet evolving needs. The Calvert Cliffs deal fits this model, combining long-term power purchases with support for incremental capacity expansion.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What&#8217;s still open<\/h2>\n\n\n\n<ul class=\"wp-block-list\"><li>Whether the 2030 to 2032 delivery timeline for new Calvert Cliffs capacity will hold, given the complexity of nuclear uprates and potential regulatory or engineering delays.<\/li><li>How Amazon will bridge the gap between now and 2030, when the first incremental nuclear power comes online, for data centers that need electricity sooner.<\/li><li>Whether the $5 billion conditional DOE loan commitment will be finalized and what specific uprate projects it will ultimately support.<\/li><li>How transmission constraints in the PJM market will affect Amazon&#8217;s ability to use the Calvert Cliffs power at specific data center locations.<\/li><li>What additional nuclear uprate deals Constellation or other utilities may announce as more tech companies seek long-term clean power for AI.<\/li><\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">\u270d\ufe0f About the analysis<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">This independent i10x analysis is based on Constellation&#8217;s announcements of the Amazon power-purchase agreement and related quarterly results. Source names are given in the text; we do not link out to those pages.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">\ud83d\udd2d i10x Perspective<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The Calvert Cliffs deal is a pragmatic bet on incremental nuclear capacity, not a silver bullet for AI&#8217;s power crunch. Amazon is paying billions to add 190 megawatts starting in 2030, which is meaningful but modest compared to the scale of projected AI data center demand. The real significance is the financing model: long-term corporate commitments that let utilities invest in uprates without burdening ratepayers. That could unlock gigawatts of additional clean baseload power over the next decade. But the 2030 timeline also highlights the mismatch between AI&#8217;s breakneck growth and the slow pace of energy infrastructure. Companies that need power in 2027 or 2028 will have to look elsewhere, which is why we are seeing parallel investments in gas generators, grid-scale batteries and even experimental fusion projects. The nuclear uprate wave is real, but it is a medium-term solution arriving after the immediate crisis has already forced harder trade-offs.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Constellation and Amazon signed a 20-year power purchase agreement supporting 190 MW of new nuclear capacity at Maryland&#8217;s Calvert Cliffs plant, part of a broader $3 billion infrastructure investment delivering emissions-free electricity for AI data centers starting in 2030.<\/p>\n","protected":false},"author":2,"featured_media":9161,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"paper_title":"","paper_url":"","pdf_url":"","doi":"","arxiv_id":"","authors":"","institutions":"","paper_date":"","venue":"","peer_reviewed":false,"code_url":"","data_url":"","funding_coi":"","figure_license":"","paper_license":"","replication":"","study_models":"","study_sample":"","footnotes":"","_yoast_wpseo_primary_category":"71","_nx_sec_severity":"","_nx_sec_affected":"","_nx_sec_status":"","_nx_sec_kicker":"","_nx_sec_type":"","_nx_sec_vendor":"","_nx_sec_fixed":"","_nx_sec_action":""},"categories":[71],"tags":[],"companies":[],"products":[],"class_list":["post-9162","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-climate-energy"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Constellation, Amazon Add Nuclear Power for AI - i10X News<\/title>\n<meta name=\"description\" content=\"Constellation and Amazon signed a 20-year deal adding 190 MW of nuclear power for AI at Calvert Cliffs, with new capacity online by 2032 and $3 billion in upgrades.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/i10xnews.kinsta.cloud\/constellation-amazon-add-nuclear-power-for-ai-at-calvert-cliffs\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Constellation, Amazon Add Nuclear Power for AI - i10X News\" \/>\n<meta property=\"og:description\" content=\"Constellation and Amazon signed a 20-year deal adding 190 MW of nuclear power for AI at Calvert Cliffs, with new capacity online by 2032 and $3 billion in upgrades.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/i10xnews.kinsta.cloud\/constellation-amazon-add-nuclear-power-for-ai-at-calvert-cliffs\" \/>\n<meta property=\"og:site_name\" content=\"i10X News\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-16T13:35:28+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-16T13:40:38+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/i10xnews.kinsta.cloud\/wp-content\/uploads\/2026\/11\/amazon-calvert.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1344\" \/>\n\t<meta property=\"og:image:height\" content=\"768\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"Christopher Ort\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/i10x.ai\/news\/wp-content\/uploads\/2026\/10\/i10x-news-og-default-1200x630-1.png\" \/>\n<meta name=\"twitter:creator\" content=\"@i10x_ai\" \/>\n<meta name=\"twitter:site\" content=\"@i10x_ai\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Christopher Ort\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"NewsArticle\",\"@id\":\"https:\\\/\\\/i10xnews.kinsta.cloud\\\/constellation-amazon-add-nuclear-power-for-ai-at-calvert-cliffs#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/i10xnews.kinsta.cloud\\\/constellation-amazon-add-nuclear-power-for-ai-at-calvert-cliffs\"},\"author\":{\"name\":\"Christopher Ort\",\"@id\":\"https:\\\/\\\/i10x.ai\\\/news\\\/#\\\/schema\\\/person\\\/d410bb7ee72febefca2c9c369939219a\"},\"headline\":\"Constellation, Amazon Add Nuclear Power for AI at Calvert Cliffs\",\"datePublished\":\"2026-11-16T13:35:28+00:00\",\"dateModified\":\"2026-11-16T13:40:38+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/i10xnews.kinsta.cloud\\\/constellation-amazon-add-nuclear-power-for-ai-at-calvert-cliffs\"},\"wordCount\":1773,\"publisher\":{\"@id\":\"https:\\\/\\\/i10x.ai\\\/news\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/i10xnews.kinsta.cloud\\\/constellation-amazon-add-nuclear-power-for-ai-at-calvert-cliffs#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/i10x.ai\\\/news\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/amazon-calvert.webp\",\"articleSection\":[\"Climate &amp; Energy\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/i10xnews.kinsta.cloud\\\/constellation-amazon-add-nuclear-power-for-ai-at-calvert-cliffs\",\"url\":\"https:\\\/\\\/i10xnews.kinsta.cloud\\\/constellation-amazon-add-nuclear-power-for-ai-at-calvert-cliffs\",\"name\":\"Constellation, Amazon Add Nuclear Power for AI - i10X News\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/i10x.ai\\\/news\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/i10xnews.kinsta.cloud\\\/constellation-amazon-add-nuclear-power-for-ai-at-calvert-cliffs#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/i10xnews.kinsta.cloud\\\/constellation-amazon-add-nuclear-power-for-ai-at-calvert-cliffs#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/i10x.ai\\\/news\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/amazon-calvert.webp\",\"datePublished\":\"2026-11-16T13:35:28+00:00\",\"dateModified\":\"2026-11-16T13:40:38+00:00\",\"description\":\"Constellation and Amazon signed a 20-year deal adding 190 MW of nuclear power for AI at Calvert Cliffs, with new capacity online by 2032 and $3 billion in upgrades.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/i10xnews.kinsta.cloud\\\/constellation-amazon-add-nuclear-power-for-ai-at-calvert-cliffs#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/i10xnews.kinsta.cloud\\\/constellation-amazon-add-nuclear-power-for-ai-at-calvert-cliffs\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/i10xnews.kinsta.cloud\\\/constellation-amazon-add-nuclear-power-for-ai-at-calvert-cliffs#primaryimage\",\"url\":\"https:\\\/\\\/i10x.ai\\\/news\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/amazon-calvert.webp\",\"contentUrl\":\"https:\\\/\\\/i10x.ai\\\/news\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/amazon-calvert.webp\",\"width\":1344,\"height\":768,\"caption\":\"Image: AI-generated, i10X\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/i10xnews.kinsta.cloud\\\/constellation-amazon-add-nuclear-power-for-ai-at-calvert-cliffs#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/i10x.ai\\\/news\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Constellation, Amazon Add Nuclear Power for AI at Calvert Cliffs\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/i10x.ai\\\/news\\\/#website\",\"url\":\"https:\\\/\\\/i10x.ai\\\/news\",\"name\":\"i10X News\",\"description\":\"Stay updated with the latest news and announcements from i10X.\",\"publisher\":{\"@id\":\"https:\\\/\\\/i10x.ai\\\/news\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/i10x.ai\\\/news?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/i10x.ai\\\/news\\\/#organization\",\"name\":\"i10X\",\"url\":\"https:\\\/\\\/i10x.ai\\\/news\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/i10x.ai\\\/news\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/i10xnews.kinsta.cloud\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/i10x-logo-180.png\",\"contentUrl\":\"https:\\\/\\\/i10xnews.kinsta.cloud\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/i10x-logo-180.png\",\"width\":180,\"height\":180,\"caption\":\"i10X\"},\"image\":{\"@id\":\"https:\\\/\\\/i10x.ai\\\/news\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/x.com\\\/i10x_ai\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/i10x-ai\",\"https:\\\/\\\/instagram.com\\\/i10x.ai\",\"https:\\\/\\\/www.youtube.com\\\/@i10X_ai_official\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/i10x.ai\\\/news\\\/#\\\/schema\\\/person\\\/d410bb7ee72febefca2c9c369939219a\",\"name\":\"Christopher Ort\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/i10x.ai\\\/news\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/christopher-ort-192.webp\",\"url\":\"https:\\\/\\\/i10x.ai\\\/news\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/christopher-ort-192.webp\",\"contentUrl\":\"https:\\\/\\\/i10x.ai\\\/news\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/christopher-ort-192.webp\",\"caption\":\"Christopher Ort\"},\"description\":\"Christopher Ort handles SEO, AI agent workflows and PR & partnerships at i10x.ai, the all-in-one AI workspace built by i10X Global Pte. Ltd. in Singapore. He is a graduate of Friedrich-Alexander-Universit\u00e4t Erlangen-N\u00fcrnberg (FAU). He is the author of \u201cThe Style Penalty\u201d, a study published on SSRN that analyses 1,576 evaluation decisions by four frontier AI models to show how AI-written CVs fare in automated hiring screens; the research has been covered by heise online and t3n.\",\"url\":\"https:\\\/\\\/i10x.ai\\\/news\\\/author\\\/christopher-ort\",\"sameAs\":[\"https:\\\/\\\/i10x.ai\\\/blog\\\/author\\\/christopher-ort\"],\"worksFor\":{\"@id\":\"https:\\\/\\\/i10x.ai\\\/news\\\/#organization\"},\"alumniOf\":{\"@type\":\"EducationalOrganization\",\"name\":\"Friedrich-Alexander-Universit\u00e4t Erlangen-N\u00fcrnberg (FAU)\",\"url\":\"https:\\\/\\\/www.fau.eu\"},\"subjectOf\":[{\"@type\":\"CreativeWork\",\"url\":\"https:\\\/\\\/papers.ssrn.com\\\/abstract=7426699\",\"name\":\"The Style Penalty: How AI Resume-Writing Tools Shape Outcomes in Automated Hiring Screens\"},{\"@type\":\"CreativeWork\",\"url\":\"https:\\\/\\\/www.heise.de\\\/news\\\/KI-Chatbots-bewerten-KI-Lebenslaeufe-Claude-findet-sich-besser-als-GPT-11317531.html\",\"name\":\"KI-Chatbots bewerten KI-Lebensl\u00e4ufe: Claude findet sich besser als GPT\"},{\"@type\":\"CreativeWork\",\"url\":\"https:\\\/\\\/t3n.de\\\/news\\\/bewerbung-schreiben-ki-5-fehler-1747190\\\/\",\"name\":\"Bewerbung mit KI schreiben: Diese 5 Fehler solltet ihr laut Studien vermeiden\"}]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Constellation, Amazon Add Nuclear Power for AI - i10X News","description":"Constellation and Amazon signed a 20-year deal adding 190 MW of nuclear power for AI at Calvert Cliffs, with new capacity online by 2032 and $3 billion in upgrades.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/i10xnews.kinsta.cloud\/constellation-amazon-add-nuclear-power-for-ai-at-calvert-cliffs","og_locale":"en_US","og_type":"article","og_title":"Constellation, Amazon Add Nuclear Power for AI - i10X News","og_description":"Constellation and Amazon signed a 20-year deal adding 190 MW of nuclear power for AI at Calvert Cliffs, with new capacity online by 2032 and $3 billion in upgrades.","og_url":"https:\/\/i10xnews.kinsta.cloud\/constellation-amazon-add-nuclear-power-for-ai-at-calvert-cliffs","og_site_name":"i10X News","article_published_time":"2026-11-16T13:35:28+00:00","article_modified_time":"2026-11-16T13:40:38+00:00","og_image":[{"width":1344,"height":768,"url":"https:\/\/i10xnews.kinsta.cloud\/wp-content\/uploads\/2026\/11\/amazon-calvert.webp","type":"image\/webp"}],"author":"Christopher Ort","twitter_card":"summary_large_image","twitter_image":"https:\/\/i10x.ai\/news\/wp-content\/uploads\/2026\/10\/i10x-news-og-default-1200x630-1.png","twitter_creator":"@i10x_ai","twitter_site":"@i10x_ai","twitter_misc":{"Written by":"Christopher Ort","Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/i10xnews.kinsta.cloud\/constellation-amazon-add-nuclear-power-for-ai-at-calvert-cliffs#article","isPartOf":{"@id":"https:\/\/i10xnews.kinsta.cloud\/constellation-amazon-add-nuclear-power-for-ai-at-calvert-cliffs"},"author":{"name":"Christopher Ort","@id":"https:\/\/i10x.ai\/news\/#\/schema\/person\/d410bb7ee72febefca2c9c369939219a"},"headline":"Constellation, Amazon Add Nuclear Power for AI at Calvert Cliffs","datePublished":"2026-11-16T13:35:28+00:00","dateModified":"2026-11-16T13:40:38+00:00","mainEntityOfPage":{"@id":"https:\/\/i10xnews.kinsta.cloud\/constellation-amazon-add-nuclear-power-for-ai-at-calvert-cliffs"},"wordCount":1773,"publisher":{"@id":"https:\/\/i10x.ai\/news\/#organization"},"image":{"@id":"https:\/\/i10xnews.kinsta.cloud\/constellation-amazon-add-nuclear-power-for-ai-at-calvert-cliffs#primaryimage"},"thumbnailUrl":"https:\/\/i10x.ai\/news\/wp-content\/uploads\/2026\/11\/amazon-calvert.webp","articleSection":["Climate &amp; Energy"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/i10xnews.kinsta.cloud\/constellation-amazon-add-nuclear-power-for-ai-at-calvert-cliffs","url":"https:\/\/i10xnews.kinsta.cloud\/constellation-amazon-add-nuclear-power-for-ai-at-calvert-cliffs","name":"Constellation, Amazon Add Nuclear Power for AI - i10X News","isPartOf":{"@id":"https:\/\/i10x.ai\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/i10xnews.kinsta.cloud\/constellation-amazon-add-nuclear-power-for-ai-at-calvert-cliffs#primaryimage"},"image":{"@id":"https:\/\/i10xnews.kinsta.cloud\/constellation-amazon-add-nuclear-power-for-ai-at-calvert-cliffs#primaryimage"},"thumbnailUrl":"https:\/\/i10x.ai\/news\/wp-content\/uploads\/2026\/11\/amazon-calvert.webp","datePublished":"2026-11-16T13:35:28+00:00","dateModified":"2026-11-16T13:40:38+00:00","description":"Constellation and Amazon signed a 20-year deal adding 190 MW of nuclear power for AI at Calvert Cliffs, with new capacity online by 2032 and $3 billion in upgrades.","breadcrumb":{"@id":"https:\/\/i10xnews.kinsta.cloud\/constellation-amazon-add-nuclear-power-for-ai-at-calvert-cliffs#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/i10xnews.kinsta.cloud\/constellation-amazon-add-nuclear-power-for-ai-at-calvert-cliffs"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/i10xnews.kinsta.cloud\/constellation-amazon-add-nuclear-power-for-ai-at-calvert-cliffs#primaryimage","url":"https:\/\/i10x.ai\/news\/wp-content\/uploads\/2026\/11\/amazon-calvert.webp","contentUrl":"https:\/\/i10x.ai\/news\/wp-content\/uploads\/2026\/11\/amazon-calvert.webp","width":1344,"height":768,"caption":"Image: AI-generated, i10X"},{"@type":"BreadcrumbList","@id":"https:\/\/i10xnews.kinsta.cloud\/constellation-amazon-add-nuclear-power-for-ai-at-calvert-cliffs#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/i10x.ai\/news"},{"@type":"ListItem","position":2,"name":"Constellation, Amazon Add Nuclear Power for AI at Calvert Cliffs"}]},{"@type":"WebSite","@id":"https:\/\/i10x.ai\/news\/#website","url":"https:\/\/i10x.ai\/news","name":"i10X News","description":"Stay updated with the latest news and announcements from i10X.","publisher":{"@id":"https:\/\/i10x.ai\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/i10x.ai\/news?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/i10x.ai\/news\/#organization","name":"i10X","url":"https:\/\/i10x.ai\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/i10x.ai\/news\/#\/schema\/logo\/image\/","url":"https:\/\/i10xnews.kinsta.cloud\/wp-content\/uploads\/2026\/10\/i10x-logo-180.png","contentUrl":"https:\/\/i10xnews.kinsta.cloud\/wp-content\/uploads\/2026\/10\/i10x-logo-180.png","width":180,"height":180,"caption":"i10X"},"image":{"@id":"https:\/\/i10x.ai\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/x.com\/i10x_ai","https:\/\/www.linkedin.com\/company\/i10x-ai","https:\/\/instagram.com\/i10x.ai","https:\/\/www.youtube.com\/@i10X_ai_official"]},{"@type":"Person","@id":"https:\/\/i10x.ai\/news\/#\/schema\/person\/d410bb7ee72febefca2c9c369939219a","name":"Christopher Ort","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/i10x.ai\/news\/wp-content\/uploads\/2026\/10\/christopher-ort-192.webp","url":"https:\/\/i10x.ai\/news\/wp-content\/uploads\/2026\/10\/christopher-ort-192.webp","contentUrl":"https:\/\/i10x.ai\/news\/wp-content\/uploads\/2026\/10\/christopher-ort-192.webp","caption":"Christopher Ort"},"description":"Christopher Ort handles SEO, AI agent workflows and PR & partnerships at i10x.ai, the all-in-one AI workspace built by i10X Global Pte. Ltd. in Singapore. He is a graduate of Friedrich-Alexander-Universit\u00e4t Erlangen-N\u00fcrnberg (FAU). He is the author of \u201cThe Style Penalty\u201d, a study published on SSRN that analyses 1,576 evaluation decisions by four frontier AI models to show how AI-written CVs fare in automated hiring screens; the research has been covered by heise online and t3n.","url":"https:\/\/i10x.ai\/news\/author\/christopher-ort","sameAs":["https:\/\/i10x.ai\/blog\/author\/christopher-ort"],"worksFor":{"@id":"https:\/\/i10x.ai\/news\/#organization"},"alumniOf":{"@type":"EducationalOrganization","name":"Friedrich-Alexander-Universit\u00e4t Erlangen-N\u00fcrnberg (FAU)","url":"https:\/\/www.fau.eu"},"subjectOf":[{"@type":"CreativeWork","url":"https:\/\/papers.ssrn.com\/abstract=7426699","name":"The Style Penalty: How AI Resume-Writing Tools Shape Outcomes in Automated Hiring Screens"},{"@type":"CreativeWork","url":"https:\/\/www.heise.de\/news\/KI-Chatbots-bewerten-KI-Lebenslaeufe-Claude-findet-sich-besser-als-GPT-11317531.html","name":"KI-Chatbots bewerten KI-Lebensl\u00e4ufe: Claude findet sich besser als GPT"},{"@type":"CreativeWork","url":"https:\/\/t3n.de\/news\/bewerbung-schreiben-ki-5-fehler-1747190\/","name":"Bewerbung mit KI schreiben: Diese 5 Fehler solltet ihr laut Studien vermeiden"}]}]}},"_links":{"self":[{"href":"https:\/\/i10x.ai\/news\/wp-json\/wp\/v2\/posts\/9162","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/i10x.ai\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/i10x.ai\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/i10x.ai\/news\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/i10x.ai\/news\/wp-json\/wp\/v2\/comments?post=9162"}],"version-history":[{"count":1,"href":"https:\/\/i10x.ai\/news\/wp-json\/wp\/v2\/posts\/9162\/revisions"}],"predecessor-version":[{"id":9195,"href":"https:\/\/i10x.ai\/news\/wp-json\/wp\/v2\/posts\/9162\/revisions\/9195"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/i10x.ai\/news\/wp-json\/wp\/v2\/media\/9161"}],"wp:attachment":[{"href":"https:\/\/i10x.ai\/news\/wp-json\/wp\/v2\/media?parent=9162"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/i10x.ai\/news\/wp-json\/wp\/v2\/categories?post=9162"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/i10x.ai\/news\/wp-json\/wp\/v2\/tags?post=9162"},{"taxonomy":"company","embeddable":true,"href":"https:\/\/i10x.ai\/news\/wp-json\/wp\/v2\/companies?post=9162"},{"taxonomy":"product","embeddable":true,"href":"https:\/\/i10x.ai\/news\/wp-json\/wp\/v2\/products?post=9162"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}