Big Tech Energy Deals

Every major nuclear, fusion and clean power deal by Amazon, Google, Meta and Microsoft: megawatts, partner, site, term and when the power arrives.

Updated November 16, 202629 deals tracked, 2023 to 2026Every row sourcedMethodologyCite or embed

Capacity announced in tracked deals
56.6 GW
headline figures, incl. targets
Of which nuclear
33.8 GW
existing, restarted and new reactors
Natural gas for data centers
7.2 GW
Microsoft, Oracle, Meta
Largest single deal
12 GW
Switch and Oklo, non-binding master agreement

Who is buying, and what

By buyer (GW)

  1. Microsoft14.1
  2. Switch12
  3. Meta11.7
  4. Amazon8.9
  5. Google7.2
  6. Oracle2.3
  7. Equinix0.5
Sum of headline GW per buyer. Download chart (SVG)

By technology (GW)

  1. New nuclear26.8
  2. Wind and solar11.9
  3. Natural gas7.2
  4. Existing nuclear7
  5. Hydropower3
  6. Geothermal0.4
  7. Fusion0.3
New nuclear means SMRs, Gen IV and other new reactors. Existing nuclear means keeping, restarting or uprating plants that already exist. Download chart (SVG)

Deals by technology

  1. New nuclear8
  2. Existing nuclear7
  3. Natural gas3
  4. Wind and solar3
  5. Geothermal3
  6. Other2
  7. Fusion2
  8. Hydropower1
All deals, including the two without a stated capacity. Download chart (SVG)

Every tracked deal

Newest first. MW as announced. Filter by buyer or technology.

29 rows

AnnouncedBuyerPartnerTechnologyMWWhereTermPower fromSource
GoogleConstellation Our storyNuclear (uprates at 11 units)890Illinois, Pennsylvania, New Jersey20 yearsFirst uprate 2028constellationenergy.com (opens in a new tab)
AmazonConstellation Our storyNuclear (existing plant, uprate)690Calvert Cliffs, Maryland20 yearsUprate 2030 to 2032constellationenergy.com (opens in a new tab)
MicrosoftChevronNatural gas (new plant)2,670Project Kilby, West Texas20 years2028chevroncorp.gcs-web.com (opens in a new tab)
MetaVistra, TerraPower, OkloNuclear (existing, new reactors)6,600Ohio and other US sitesUp to 20 yearsBy 2035about.fb.com (opens in a new tab)
GoogleIntersectAcquisition (energy developer)n/aUSAcquisitionClosed March 2026abc.xyz (opens in a new tab)
GoogleNextEra EnergyData center campuses with own generationn/aUS, first three campuses not namedPartnershipNot statednewsroom.nexteraenergy.com (opens in a new tab)
GoogleNextEra EnergyNuclear (restart)615Duane Arnold, Iowa25 yearsTargeted Q1 2029investor.nexteraenergy.com (opens in a new tab)
MetaENGIERenewables (solar)600Swenson Ranch, Stonewall County, TexasPPA2027engie-na.com (opens in a new tab)
OracleVoltaGridNatural gas (modular)2,300TexasNot statedNot statedvoltagrid.com (opens in a new tab)
MetaEntergy LouisianaNatural gas (new plants)2,262Hyperion data center, Richland Parish, LouisianaRegulator approvalLate 2028 and 2029entergy.com (opens in a new tab)
GoogleKairos Power, TVAAdvanced nuclear (Gen IV)50Hermes 2, Oak Ridge, TennesseeNot stated2030blog.google (opens in a new tab)
GoogleBrookfieldHydropower3,000Holtwood and Safe Harbor, Pennsylvania, and other US sitesFramework; first PPAs 20 yearsNot statedbam.brookfield.com (opens in a new tab)
GoogleCommonwealth Fusion SystemsFusion200ARC, Chesterfield County, VirginiaNot statedEarly 2030s (planned)blog.google (opens in a new tab)
MetaInvenergyRenewables (wind, solar)791Ohio, Arkansas, TexasPPAs2027 and 2028invenergy.com (opens in a new tab)
MetaXGS EnergyGeothermal (advanced)150New MexicoNot statedBy 2030xgsenergy.com (opens in a new tab)
AmazonTalen EnergyNuclear (existing plant)1,920Susquehanna, Pennsylvania17 yearsRamps to full volume by 2032sec.gov (opens in a new tab)
MetaConstellation Our storyNuclear (existing plant)1,121Clinton, Illinois20 yearsJune 2027constellationenergy.com (opens in a new tab)
GoogleElementl PowerAdvanced nuclear (site development)1,800Three US sites, not namedDevelopment capital, offtake optionNot statedelementlpower.io (opens in a new tab)
SwitchOkloAdvanced nuclear (new reactors)12,000USNon-binding master agreementThrough 2044oklo.com (opens in a new tab)
AmazonX-energySmall modular reactors5,000Washington state and other US sitesTarget, not a PPABy 2039x-energy.com (opens in a new tab)
AmazonDominion EnergySmall modular reactors (explore)300North Anna, VirginiaMemorandum of understandingNot statednews.dominionenergy.com (opens in a new tab)
GoogleKairos PowerSmall modular reactors500US, sites not namedFleet agreementFirst reactor by 2030, more through 2035blog.google (opens in a new tab)
MicrosoftConstellation Our storyNuclear (restart)835Crane (Three Mile Island Unit 1), Pennsylvania20 yearsRestart plannedconstellationenergy.com (opens in a new tab)
MetaSage GeosystemsGeothermal (advanced)150East of the Rocky MountainsNot statedFirst phase 2027about.fb.com (opens in a new tab)
GoogleNV Energy, Fervo EnergyGeothermal (enhanced)115Corsac Station, NevadaClean Transition TariffApproved May 2025blog.google (opens in a new tab)
MicrosoftBrookfieldRenewables (wind, solar)10,500US and EuropeFramework, 2026 to 20302026bep.brookfield.com (opens in a new tab)
EquinixOkloAdvanced nuclear (new reactors)500USPre-agreement, 20-year PPAsNot statedsec.gov (opens in a new tab)
AmazonTalen EnergyNuclear (campus purchase)960Cumulus campus at Susquehanna, PennsylvaniaCampus sale plus PPA2024ir.talenenergy.com (opens in a new tab)
MicrosoftHelionFusion50Washington statePPAPlant targeted 2028helionenergy.com (opens in a new tab)

Deal timeline

  1. Google and Constellation: 890 MW, nuclear (uprates at 11 units)

    Constellation plans to invest about $4.3 billion in the uprates.

    constellationenergy.com (opens in a new tab)

  2. Amazon and Constellation: 690 MW, nuclear (existing plant, uprate)

    690 MW including a 190 MW uprate; power stays on the PJM grid.

    constellationenergy.com (opens in a new tab)

  3. Microsoft and Chevron: 2,670 MW, natural gas (new plant)

    Co-located gas power plant of about 2.67 GW for a Microsoft data center.

    chevroncorp.gcs-web.com (opens in a new tab)

  4. Meta and Vistra, TerraPower, Oklo: 6,600 MW, nuclear (existing, new reactors)

    Up to 6.6 GW of new and existing nuclear capacity across three agreements.

    about.fb.com (opens in a new tab)

  5. Google and Intersect: acquisition (energy developer)

    Alphabet agreed to buy the data center and energy developer for $4.75 billion in cash plus assumed debt.

    abc.xyz (opens in a new tab)

  6. Google and NextEra Energy: data center campuses with own generation

    Joint development of gigawatt-scale data center campuses with dedicated generation.

    newsroom.nexteraenergy.com (opens in a new tab)

  7. Google and NextEra Energy: 615 MW, nuclear (restart)

    Restart of Iowa's only nuclear plant.

    investor.nexteraenergy.com (opens in a new tab)

  8. Meta and ENGIE: 600 MW, renewables (solar)

    New 600 MW solar project takes ENGIE contracts with Meta to more than 1.3 GW.

    engie-na.com (opens in a new tab)

  9. Oracle and VoltaGrid: 2,300 MW, natural gas (modular)

    2.3 GW of modular natural gas power for Oracle Cloud Infrastructure AI data centers.

    voltagrid.com (opens in a new tab)

  10. Meta and Entergy Louisiana: 2,262 MW, natural gas (new plants)

    Louisiana regulators approved three combined-cycle gas plants to serve the Meta data center.

    entergy.com (opens in a new tab)

  11. Google and Kairos Power, TVA: 50 MW, advanced nuclear (gen iv)

    First purchase of power from a Gen IV reactor by a US utility.

    blog.google (opens in a new tab)

  12. Google and Brookfield: 3,000 MW, hydropower

    Framework for up to 3,000 MW; first contracts cover 670 MW and more than $3 billion.

    bam.brookfield.com (opens in a new tab)

  13. Google and Commonwealth Fusion Systems: 200 MW, fusion

    Largest direct corporate offtake agreement for fusion power, per Google.

    blog.google (opens in a new tab)

  14. Meta and Invenergy: 791 MW, renewables (wind, solar)

    Four solar and wind projects totalling 791 MW.

    invenergy.com (opens in a new tab)

  15. Meta and XGS Energy: 150 MW, geothermal (advanced)

    Closed-loop geothermal project on the PNM grid, built in two phases.

    xgsenergy.com (opens in a new tab)

  16. Amazon and Talen Energy: 1,920 MW, nuclear (existing plant)

    About $18 billion over the contract, per Talen.

    sec.gov (opens in a new tab)

  17. Meta and Constellation: 1,121 MW, nuclear (existing plant)

    Supports relicensing; adds 30 MW through uprates.

    constellationenergy.com (opens in a new tab)

  18. Google and Elementl Power: 1,800 MW, advanced nuclear (site development)

    Three sites of at least 600 MW each; Google has an option to buy the power.

    elementlpower.io (opens in a new tab)

  19. Switch and Oklo: 12,000 MW, advanced nuclear (new reactors)

    12 GW of Oklo Aurora powerhouses, with binding PPAs as milestones are met.

    oklo.com (opens in a new tab)

  20. Amazon and X-energy: 5,000 MW, small modular reactors

    Goal of more than 5 GW of SMRs; Amazon co-led a $500M round in X-energy.

    x-energy.com (opens in a new tab)

  21. Amazon and Dominion Energy: 300 MW, small modular reactors (explore)

    Agreement to explore an SMR of at least 300 MW near North Anna; not a commitment to build.

    news.dominionenergy.com (opens in a new tab)

  22. Google and Kairos Power: 500 MW, small modular reactors

    Up to 500 MW of new 24/7 carbon-free power.

    blog.google (opens in a new tab)

  23. Microsoft and Constellation: 835 MW, nuclear (restart)

    Constellation's largest-ever power purchase agreement.

    constellationenergy.com (opens in a new tab)

  24. Meta and Sage Geosystems: 150 MW, geothermal (advanced)

    Up to 150 MW of geopressured geothermal power.

    about.fb.com (opens in a new tab)

  25. Google and NV Energy, Fervo Energy: 115 MW, geothermal (enhanced)

    Utility tariff that supplies Google with 115 MW of enhanced geothermal power.

    blog.google (opens in a new tab)

  26. Microsoft and Brookfield: 10,500 MW, renewables (wind, solar)

    Framework for over 10.5 GW of new renewable capacity.

    bep.brookfield.com (opens in a new tab)

  27. Equinix and Oklo: 500 MW, advanced nuclear (new reactors)

    Up to 500 MW with a $25 million prepayment.

    sec.gov (opens in a new tab)

  28. Amazon and Talen Energy: 960 MW, nuclear (campus purchase)

    AWS bought the 960 MW data center campus next to the Susquehanna plant for $650 million.

    ir.talenenergy.com (opens in a new tab)

  29. Microsoft and Helion: 50 MW, fusion

    First fusion power purchase agreement; at least 50 MW after a one-year ramp.

    helionenergy.com (opens in a new tab)

Methodology

One row per announced agreement between a large AI company and a power producer or developer, sourced to the press release or a trade publication that quotes it. Capacity is the headline megawatt figure as announced. Targets and frameworks are marked in the Term column.

Limits. Headline capacity is not delivered power: many projects are years away, and targets may not be met. We list deals of 50 MW or more by the four largest US cloud and AI spenders.

Data note. Capacity is the headline figure each company announced. Targets, frameworks and non-binding agreements (for example Switch and Oklo, Amazon and X-energy, Microsoft and Brookfield, Meta's 6.6 GW) are upper bounds, not contracted output, and are labelled in the Term column. Two Google deals (Intersect, NextEra campuses) state no capacity and are left out of the totals. Switch and Equinix are data center operators, not Big Tech, and are included because their deals are among the largest.

All 29 sources
  1. https://www.constellationenergy.com/news/2026/10/google-and-constellation-announce-landmark-agreement-to-bring-890-mw-of-new-nuclear-capacity-to-pjm-grid.html (opens in a new tab)
  2. https://www.constellationenergy.com/news/2026/09/constellation-and-amazon-announce-20-year-power-purchase-agreement-at-calvert-cliffs.html (opens in a new tab)
  3. https://chevroncorp.gcs-web.com/news-releases/news-release-details/chevron-signs-20-year-power-agreement-microsoft-west-texas-data (opens in a new tab)
  4. https://about.fb.com/news/2026/01/meta-nuclear-energy-projects-power-american-ai-leadership/ (opens in a new tab)
  5. https://abc.xyz/investor/news/news-details/2025/Alphabet-Announces-Agreement-to-Acquire-Intersect-to-Advance-U-S–Energy-Innovation-2025-DVIuVDM9wW/ (opens in a new tab)
  6. https://newsroom.nexteraenergy.com/2025-12-08-NextEra-Energy-and-Google-Cloud-Announce-Landmark-Strategic-Energy-and-Technology-Partnership-to-Accelerate-AI-Growth-and-Transform-the-Energy-Industry (opens in a new tab)
  7. https://www.investor.nexteraenergy.com/news-and-events/news-releases/2025/10-27-2025-203948689 (opens in a new tab)
  8. https://www.engie-na.com/engie-and-meta-expand-ppa-to-more-than-1-3-gw/ (opens in a new tab)
  9. https://voltagrid.com/voltagrid-collaborates-with-oracle-to-power-next-gen-ai-data-centers (opens in a new tab)
  10. https://www.entergy.com/news/entergy-louisiana-receives-lpsc-approval-for-major-infrastructure-investments-to-support-metas-data-center-and-improve-reliability (opens in a new tab)
  11. https://blog.google/company-news/outreach-and-initiatives/sustainability/google-first-advanced-nuclear-reactor-project-with-kairos-power-and-tennessee-valley-authority/ (opens in a new tab)
  12. https://bam.brookfield.com/press-releases/brookfield-and-google-sign-hydro-framework-agreement-deliver-3000-mw-homegrown (opens in a new tab)
  13. https://blog.google/company-news/outreach-and-initiatives/sustainability/our-latest-bet-on-a-fusion-powered-future/ (opens in a new tab)
  14. https://invenergy.com/2025/06/26/invenergy-to-provide-meta-with-nearly-800-mw-supporting-data-center-operations/ (opens in a new tab)
  15. https://www.xgsenergy.com/xgs-energy-and-meta-to-partner-on-150-mw-advanced-geothermal-project/ (opens in a new tab)
  16. https://www.sec.gov/Archives/edgar/data/1622536/000162828025030559/a20250611pressreleasebusin.htm (opens in a new tab)
  17. https://www.constellationenergy.com/news/2025/constellation-meta-sign-20-year-deal-for-clean-reliable-nuclear-energy-in-illinois.html (opens in a new tab)
  18. https://www.elementlpower.io/newsroom/050725/google (opens in a new tab)
  19. https://oklo.com/newsroom/oklo-and-switch-form-landmark-strategic-relationship-to-deploy-12-gigawatts-of-advanced-nuclear- (opens in a new tab)
  20. https://x-energy.com/news/amazon-invests-in-x-energy-to-support-advanced-small-modular-nuclear-reactors-and-expand-carbon-free-power/ (opens in a new tab)
  21. https://news.dominionenergy.com/press-releases/press-releases/2024/Dominion-Energy-and-Amazon-to-explore-advancement-of-Small-Modular-Reactor-SMR-nuclear-development-in-Virginia-10-16-2024/default.aspx (opens in a new tab)
  22. https://blog.google/outreach-initiatives/sustainability/google-kairos-power-nuclear-energy-agreement/ (opens in a new tab)
  23. https://www.constellationenergy.com/newsroom/2024/Constellation-to-Launch-Crane-Clean-Energy-Center-Restoring-Jobs-and-Carbon-Free-Power-to-The-Grid.html (opens in a new tab)
  24. https://about.fb.com/news/2024/08/new-geothermal-energy-project-to-support-our-data-centers/ (opens in a new tab)
  25. https://blog.google/company-news/outreach-and-initiatives/sustainability/google-clean-energy-partnership/ (opens in a new tab)
  26. https://bep.brookfield.com/press-releases/bep/brookfield-and-microsoft-collaborating-deliver-over-105-gw-new-renewable-power (opens in a new tab)
  27. https://www.sec.gov/Archives/edgar/data/1849056/000110465924047344/tm2324337d21_ex10-19.htm (opens in a new tab)
  28. https://ir.talenenergy.com/news-releases/news-release-details/talen-energy-announces-sale-zero-carbon-data-center-campus (opens in a new tab)
  29. https://www.helionenergy.com/articles/helion-announces-worlds-first-fusion-ppa-with-microsoft/ (opens in a new tab)

Spotted an error or a missing row? Write to the newsroom via Contact. We correct and date every change.

How to cite or embed

Free to quote, chart and embed. Please credit i10X News and link to this page.

Download CSVJSON