AI Energy Meter
How much electricity AI and data centres use: IEA and US DOE figures, grid shares, and what one AI prompt costs in energy according to Google and OpenAI.
- Virginia, 2023
- 25.6%
- of state electricity, highest in the US, restservice.epri.com (opens in a new tab)
Where data centres use the most electricity
Shade shows the data centre share of electricity where an official figure exists. Select a country, state or dot for the figure, year and source.
- Official figure, no share
- 2%+
- 4%+
- 10%+
- 20%+
- AI campus (size by announced MW)
- Data, no share
- 2%+
- 4%+
- 8%+
- 12%+
- 20%+
- AI campus (size by announced MW)
Select a highlighted area or a dot to see the figure and its source.
Forecast to 2030 and 2035
World data centres, TWh (2030 and 2035 are IEA projections)
World data centres in 2035 by IEA scenario, TWh
US data centres, TWh (2028 is the LBNL range)
Increase in data centre electricity use by 2030, TWh
Data centres compared with whole countries
National figures are total electricity generation from Ember, used as a size reference. Data centre figures are consumption.
World data centres vs national electricity generation, 2025, TWh
AI-focused data centres vs national generation, 2025, TWh
Per-prompt disclosures
| Model and unit | Wh | Water mL | g CO2e | What it covers | Source |
|---|---|---|---|---|---|
| Google Gemini Apps, median text prompt | 0.24 | 0.26 | 0.03 | Comprehensive: active accelerators, host CPU and RAM, idle capacity and data centre overhead (PUE). May 2025 measurement. | cloud.google.com (opens in a new tab) |
| Google Gemini Apps, active machine only | 0.1 | n/a | n/a | Narrow method that counts only active TPU and GPU use. Google publishes it to show how method changes the number. | cloud.google.com (opens in a new tab) |
| ChatGPT, average query | 0.34 | 0.32 | n/a | Stated by OpenAI CEO Sam Altman in June 2025 (0.000085 gallons of water). No method published. | blog.samaltman.com (opens in a new tab) |
| Mistral Large 2, 400-token response | n/a | 45 | 1.14 | Life-cycle analysis with ADEME and Carbone 4, includes training and hardware share. Energy per response not published. | mistral.ai (opens in a new tab) |
Power mix of data centres today
IEA estimate of the electricity supplying data centres worldwide (2024). Other is the remainder to 100.
- Coal 30%
- Renewables 27%
- Natural gas 26%
- Nuclear 15%
- Other 2%
Where the new power comes from
National time series
Ireland, data centres as % of metered electricity
Netherlands, data centres as % of electricity use
US states
Top US states by data centre share of electricity, 2023
Top US states by data centre electricity use, 2023, TWh
Big tech electricity use
As reported in each company sustainability report. Google reports data centres only; Microsoft and Meta report company totals, which are mostly data centres.
Google, Data centre electricity (TWh)
Microsoft, Total electricity (TWh, fiscal years)
Meta, Total electricity (TWh)
Water
Only officially reported figures. Scopes differ: Google and Meta report data centres, Microsoft reports the whole company.
Microsoft total water consumption, megalitres
Reported water consumption
| Company | Measure | Reported | Unit | Megalitres | Source |
|---|---|---|---|---|---|
| Data centre water consumption, 2025 | 10,523 | million gallons | 39,834 | sustainability.google (opens in a new tab) | |
| Microsoft | Total water consumption, FY25 | 8,170 | megalitres | 8,170 | cdn-dynmedia-1.microsoft.com (opens in a new tab) |
| Meta | Data centre water consumption, 2024 | 2,974 | megalitres | 2,974 | sustainability.atmeta.com (opens in a new tab) |
Countries
| Country | TWh | Share % | Year | Note | Source |
|---|---|---|---|---|---|
| United States | 176 | 4.4% | 2023 | LBNL for US DOE. IEA puts the US at 45% of the world total in 2024. | energy.gov (opens in a new tab) |
| China | n/a | n/a | 2024 | About 25% of the world total of 415 TWh in 2024 (IEA). IEA sees an increase of about 175 TWh by 2030. | iea.org (opens in a new tab) |
| Japan | n/a | n/a | 2024 | IEA expects Japan to add about 15 TWh by 2030 (up 80%). OCCTO projects 49.4 TWh of new data centre demand by fiscal 2035. | iea.org (opens in a new tab) |
| Germany | 20 | 4% | 2024 | Data centres and smaller IT installations. 31 TWh expected in 2030 (BMWK study). | bundeswirtschaftsministerium.de (opens in a new tab) |
| Ireland | 7.663 | 23% | 2025 | Metered consumption, up from 5% in 2015. Highest share of any country we track. | cso.ie (opens in a new tab) |
| Netherlands | 5.1 | 4.6% | 2024 | Provisional. Share rose from 1.5% in 2017. | cbs.nl (opens in a new tab) |
| United Kingdom | 4.5 | 2% | 2024 | Great Britain, grid electricity; excludes enterprise data centres. 77% in London and the South East. | assets.publishing.service.gov.uk (opens in a new tab) |
| Norway | 3.3 | n/a | 2025 | Doubled since 2023 (NVE). | nve.no (opens in a new tab) |
| Singapore | n/a | 7% | 2024 | 7% of national electricity, stated by the Senior Minister of State in May 2024. Capacity above 1.4 GW (IMDA). | mddi.gov.sg (opens in a new tab) |
| Denmark | n/a | n/a | 2030 | Energistyrelsen assumes 1,240 MW of grid capacity for data centres by 2030 (AF23). | ens.dk (opens in a new tab) |
All US states with EPRI figures
43 rows
AI campuses
Sizes as announced by the operators. Three rows rely on press reports and are marked Secondary.
11 rows
| Campus | Operator | Location | MW | Size as announced | Status | Source |
|---|---|---|---|---|---|---|
| Stargate Abilene | OpenAI, Oracle, Crusoe | Abilene, Texas | n/a | Flagship Stargate site; part of nearly 7 GW planned across Stargate sites | Operating, expanding | openai.com (opens in a new tab) |
| Stargate Shackelford County | OpenAI, Oracle | Shackelford County, Texas | n/a | Oracle-developed sites together over 5.5 GW | Announced Sep 2025 | openai.com (opens in a new tab) |
| Stargate Doña Ana County | OpenAI, Oracle | Doña Ana County, New Mexico | n/a | Oracle-developed sites together over 5.5 GW | Announced Sep 2025 | openai.com (opens in a new tab) |
| Stargate Lordstown | OpenAI, SoftBank | Lordstown, Ohio | n/a | SoftBank sites together up to 1.5 GW | Announced Sep 2025 | openai.com (opens in a new tab) |
| Stargate Milam County | OpenAI, SoftBank, SB Energy | Milam County, Texas | n/a | SoftBank sites together up to 1.5 GW | Announced Sep 2025 | openai.com (opens in a new tab) |
| Hyperion | Meta | Richland Parish, Louisiana | 5,000 | Designed to scale to 5 GW over several years | Under construction | techcrunch.com (opens in a new tab) Secondary |
| Prometheus | Meta | New Albany, Ohio | 1,000 | 1 GW cluster, expected online in 2026 | Coming online 2026 | techcrunch.com (opens in a new tab) Secondary |
| Colossus | xAI | Memphis, Tennessee | n/a | 200,000 H100 GPUs in one cluster, roadmap to 1 million GPUs; power not stated on the page | Operating | x.ai (opens in a new tab) |
| Fairwater | Microsoft | Mount Pleasant, Wisconsin | n/a | 315 acres, three buildings, 1.2 million sq ft; power not stated | Operating 2026 | blogs.microsoft.com (opens in a new tab) |
| Fairwater Atlanta | Microsoft | Atlanta, Georgia | n/a | Second Fairwater site, linked to Wisconsin by an AI WAN | Operating | blogs.microsoft.com (opens in a new tab) |
| Project Rainier | Amazon (for Anthropic) | New Carlisle, Indiana | 2,200 | More than 2.2 GW at full build, 1,200 acres | Operating, expanding | cnbc.com (opens in a new tab) Secondary |
Forecast figures
12 rows
| Area | Year | TWh | Type | Source |
|---|---|---|---|---|
| World | 2024 | 415 | Estimate | iea.org (opens in a new tab) |
| World | 2025 | 485 | Estimate | iea.org (opens in a new tab) |
| World | 2030 | 945 | IEA Base Case (2025 report) | iea.org (opens in a new tab) |
| World | 2030 | 950 | IEA projection (2026 update) | iea.org (opens in a new tab) |
| World | 2035 | 700 | Headwinds case | iea.org (opens in a new tab) |
| World | 2035 | 970 | High Efficiency case | iea.org (opens in a new tab) |
| World | 2035 | 1,200 | Base Case | iea.org (opens in a new tab) |
| World | 2035 | 1,700 | Lift-Off case (more than) | iea.org (opens in a new tab) |
| United States | 2014 | 58 | Estimate | energy.gov (opens in a new tab) |
| United States | 2023 | 176 | Estimate | energy.gov (opens in a new tab) |
| United States | 2028 | 325 | LBNL low scenario | energy.gov (opens in a new tab) |
| United States | 2028 | 580 | LBNL high scenario | energy.gov (opens in a new tab) |
Company electricity series
16 rows
| Company | Measure | Period | TWh | Source |
|---|---|---|---|---|
| Data centre electricity (TWh) | 2021 | 17.4 | sustainability.google (opens in a new tab) | |
| Data centre electricity (TWh) | 2022 | 20.6 | sustainability.google (opens in a new tab) | |
| Data centre electricity (TWh) | 2023 | 24 | sustainability.google (opens in a new tab) | |
| Data centre electricity (TWh) | 2024 | 30.6 | sustainability.google (opens in a new tab) | |
| Data centre electricity (TWh) | 2025 | 42.4 | sustainability.google (opens in a new tab) | |
| Microsoft | Total electricity (TWh, fiscal years) | FY20 | 10.8 | cdn-dynmedia-1.microsoft.com (opens in a new tab) |
| Microsoft | Total electricity (TWh, fiscal years) | FY21 | 13.6 | cdn-dynmedia-1.microsoft.com (opens in a new tab) |
| Microsoft | Total electricity (TWh, fiscal years) | FY22 | 18.2 | cdn-dynmedia-1.microsoft.com (opens in a new tab) |
| Microsoft | Total electricity (TWh, fiscal years) | FY23 | 23.6 | cdn-dynmedia-1.microsoft.com (opens in a new tab) |
| Microsoft | Total electricity (TWh, fiscal years) | FY24 | 29.8 | cdn-dynmedia-1.microsoft.com (opens in a new tab) |
| Microsoft | Total electricity (TWh, fiscal years) | FY25 | 37 | cdn-dynmedia-1.microsoft.com (opens in a new tab) |
| Meta | Total electricity (TWh) | 2020 | 7.2 | sustainability.atmeta.com (opens in a new tab) |
| Meta | Total electricity (TWh) | 2021 | 9.4 | sustainability.atmeta.com (opens in a new tab) |
| Meta | Total electricity (TWh) | 2022 | 11.5 | sustainability.atmeta.com (opens in a new tab) |
| Meta | Total electricity (TWh) | 2023 | 15.3 | sustainability.atmeta.com (opens in a new tab) |
| Meta | Total electricity (TWh) | 2024 | 18.4 | sustainability.atmeta.com (opens in a new tab) |
Methodology
We collect headline figures from the International Energy Agency, the Lawrence Berkeley National Laboratory report for the US Department of Energy, national statistics offices and company disclosures, and quote them as published with the year they refer to. Projections are labelled as projections.
Limits. Per-prompt energy figures are self-reported by companies, use different methods and cannot be compared directly. National figures cover all data centres, not only AI.
Data note. National figures are official statistics or government-commissioned studies and use different scopes and years. Per-prompt figures are self-reported by companies with different methods and are not directly comparable. Campus sizes are as announced; announced capacity is not the same as electricity use.
All 27 sources
- https://www.iea.org/reports/key-questions-on-energy-and-ai/executive-summary (opens in a new tab)
- https://www.energy.gov/articles/doe-releases-new-report-evaluating-increase-electricity-demand-data-centers (opens in a new tab)
- https://www.cso.ie/en/releasesandpublications/ep/p-dcmec/datacentresmeteredelectricityconsumption2025/keyfindings/ (opens in a new tab)
- https://restservice.epri.com/publicdownload/000000003002028905/0/Product (opens in a new tab)
- https://cloud.google.com/blog/products/infrastructure/measuring-the-environmental-impact-of-ai-inference (opens in a new tab)
- https://blog.samaltman.com/the-gentle-singularity (opens in a new tab)
- https://mistral.ai/news/our-contribution-to-a-global-environmental-standard-for-ai/ (opens in a new tab)
- https://sustainability.google/files/google-2026-environmental-report.pdf (opens in a new tab)
- https://cdn-dynmedia-1.microsoft.com/is/content/microsoftcorp/microsoft/msc/documents/presentations/CSR/2026-Microsoft-Environmental-Data-Fact-Sheet-PDF.pdf (opens in a new tab)
- https://sustainability.atmeta.com/wp-content/uploads/2025/10/Meta_2025-Environmental-Data-Index.pdf (opens in a new tab)
- https://www.iea.org/reports/energy-and-ai/energy-demand-from-ai (opens in a new tab)
- https://www.bundeswirtschaftsministerium.de/Redaktion/EN/Publikationen/Digitale-Welt/status-and-development-of-the-german-data-centre-landscape-executive-summary.pdf?__blob=publicationFile&v=2 (opens in a new tab)
- https://www.cbs.nl/en-gb/news/2025/51/data-centres-consume-4-6-percent-of-the-netherlands-electricity (opens in a new tab)
- https://assets.publishing.service.gov.uk/media/6a3ea4334c7605ab56723bfd/Data_centre_electricity_consumption_in_Great_Britain__2020_to_2024.pdf (opens in a new tab)
- https://www.nve.no/energi/energisystem/energibruk/energibruk-i-datasenter/ (opens in a new tab)
- https://www.mddi.gov.sg/newsroom/opening-by-sms-janil-puthucheary-at-atxsummit-digital-sustainability-forum/ (opens in a new tab)
- https://ens.dk/media/4384/download (opens in a new tab)
- https://openai.com/index/five-new-stargate-sites/ (opens in a new tab)
- https://techcrunch.com/2025/07/14/mark-zuckerberg-says-meta-is-building-a-5gw-ai-data-center/ (opens in a new tab)
- https://x.ai/colossus (opens in a new tab)
- https://blogs.microsoft.com/blog/2025/09/18/inside-the-worlds-most-powerful-ai-datacenter/ (opens in a new tab)
- https://blogs.microsoft.com/blog/2025/11/12/infinite-scale-the-architecture-behind-the-azure-ai-superfactory/ (opens in a new tab)
- https://www.cnbc.com/2025/10/29/amazon-opens-11-billion-ai-data-center-project-rainier-in-indiana.html (opens in a new tab)
- https://www.iea.org/reports/energy-and-ai/executive-summary (opens in a new tab)
- https://www.iea.org/reports/energy-and-ai/energy-supply-for-ai (opens in a new tab)
- https://www.occto.or.jp/assets/news/juyousoutei/260121_juyousoutei_r1.pdf (opens in a new tab)
- https://ember-energy.org/data/yearly-electricity-data/ (opens in a new tab)
Spotted an error or a missing row? Write to the newsroom via Contact. We correct and date every change.
How to cite or embed
Free to quote, chart and embed. Please credit i10X News and link to this page.
More from the data desk
- IndexAI Funding IndexMonthly AI venture totals and every tracked round, by country, sector and stage.
- TrackerHumanoid Robot Price TrackerWhat each humanoid robot costs, whether you can buy it, and what it can actually do.
- TrackerFDA AI Medical Device TrackerEvery AI-enabled medical device the FDA has authorized, by year, specialty and company.
- TrackerBig Tech Energy DealsNuclear, fusion and renewable power deals signed by Amazon, Google, Meta and Microsoft.
- TrackerAI Capex TrackerWhat Amazon, Alphabet, Microsoft, Meta, Oracle and CoreWeave spend each quarter, from SEC filings.
- TrackerAI in Education Policy TrackerWhich countries and states teach AI, give students AI tools, or set rules for schools.
- ScoreHype vs. Reality ScoreBig AI promises checked 3, 6 and 12 months later. Did they ship?
- TrackerAI Stocks TrackerMarket value of 30 listed AI chip, cloud, software and power companies, from exchange data.
- ListAI Unicorns ListAI startups valued at $1 billion or more in rounds we verified, sortable by valuation and sector.
- ComparisonRobot AI Model ComparisonGemini Robotics, GR00T, π, Helix and other robot foundation models side by side.
- ComparisonAI Tools for Education ComparedChatGPT Edu, Gemini for Education, Claude for Education, Copilot and Khanmigo: price, data terms, features.
- ComparisonAI Country ComparisonCompare countries on private AI investment, new AI companies, AI talent and AI law.
- BarometerX Conversation BarometerHow many posts on X talk about AI funding, robots, data centre power, jobs and more, day by day.
- ReportState of AI in Startups, Q4 2026Quarterly report: the key numbers from every Startups tracker in one page.
- ReportState of AI in Health & Medical Research, Q4 2026Quarterly report: the key numbers from every Health & Medical Research tracker in one page.
- ReportState of AI in Engineering & Robotics, Q4 2026Quarterly report: the key numbers from every Engineering & Robotics tracker in one page.
- ReportState of AI in Finance, Q4 2026Quarterly report: the key numbers from every Finance tracker in one page.
- ReportState of AI in Education, Q4 2026Quarterly report: the key numbers from every Education tracker in one page.
- ReportState of AI in Climate & Energy, Q4 2026Quarterly report: the key numbers from every Climate & Energy tracker in one page.
- TrackerAI M&A TrackerEvery AI acquisition, acqui-hire and licensing deal we verified, with price where stated.
- ListAI Startup GraveyardAI startups that shut down, sold for parts or folded into Big Tech, and what happened.
- BarometerAI Jobs BarometerHow many job ads ask for AI skills, and which job categories are being advertised less.
- CalculatorAI ROI CalculatorEstimate hours and money saved with AI tools, using effect sizes from published studies.
- ListBanks Using AIWhich banks use generative AI, for what, and with which vendor, from bank announcements.